2020 Annual Dams Inspection Aurora Mine

Project Highlights:

  • Annual Dam Safety Inspection

Tierra Group is the Engineer of Record (EoR) for two tailings dams at the Aurora Mine. Tierra Group provided annual dam safety inspections for the tailings dams to meet Nevada Division of Water Resources (NDWR) Dam Safety permit requirement. Work included a site visit, visual observation, instrumentation data review, and dam inspection report preparation.

Project Highlights:

  • Annual Dam Safety Inspection

Similar projects

Tennessee Mines

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to…

VIEW PROJECT

Oracle Ridge Copper

Tierra Group represented Oracle Ridge Mining as the Qualified Person for portions of the feasibility-level design including the Dry Stack Tailings Storage Facility (TSF) Design, Site-Wide Stormwater Management, Water Supply Pipelines, Haul Road and Access Road Design Improvements, and the…

VIEW PROJECT

Fekola Project

Tierra Group provided earthworks and concrete Construction Quality Control (CQC) services for B2Gold's Fekola Mine in western Mali. Tierra Group overcame the remote location and kept a dedicated team on-site throughout the 2-year mine development. Tierra Group assisted Fekola Mine…

VIEW PROJECT

El Gallo Mine

El Gallo is a 3,000 tpd open-pit gold/silver mine located in the foothills of the Sierra Madre Mountain Range in Mexico’s Sinaloa State. Gold is recovered through heap leaching and adsorption/desorption/recovery (ADR). Production commenced at El Gallo with the first gold pour in September…

VIEW PROJECT

Confidential Project - Brazil

Tierra Group performed a pre-investment technical tailings due diligence review.

VIEW PROJECT

McLaughlin WWRDF Seepage Collection

Tierra Group designed a Seepage Collection Systems (French Drains) to prevent contact water seepage from comingling with surface water runoff. The collected seepage was routed via pipelines to existing process water handling tanks.

VIEW PROJECT

Hecla Aurora Project - Weather Station Siting Assessment

Tierra Group completed a site assessment for a weather station to be installed at the site. The assessment evaluated the foundation conditions and provided recommendations regarding anchoring options for the weather station tower and ancillary components. The assessment also identified…

VIEW PROJECT

Buenaventura Photogrammetry Study for El Brocal Mine

Tierra Group developed a photogrammetry study and basic civil design for mining facilities layout at El Brocal Mine.

VIEW PROJECT

Don Mario Gold Mine

Don Mario Mine is an open pit gold/copper mine located in the Chiquitos Province, Santa Cruz, Bolivia that has been operating since 2002 and currently produces 2700 tpd mill throughput. Conventional tailings are transported and deposited in a high-density polyethylene lined geomembrane valley…

VIEW PROJECT

Copperstone Project

Tierra Group International, Ltd. participated as the geotechnical lead engineering firm for the Copperstone Project Pre-Feasibility Study (PFS) in Arizona, U.S.A. Tierra Group was responsible for tailings and waste rock storage, water management and underground geotechnics design and cost estimates…

VIEW PROJECT

Anglo American Quellaveco

Tierra Group supervised a geotechnical and hydrogeologic drilling investigation program at Anglo American’s Quellaveco Mine in the Moquegua Region of Peru.

VIEW PROJECT

Collection Pond Washdown Pad IFC Set

Tierra Group designed a concrete washdown pad connecting to the site’s existing collection pond. The pad was designed to allow the site to wash vehicles prior to them being approved to leave site.

VIEW PROJECT