Confidential Project - Brazil

Project Highlights:

  • Due Diligence
  • Tailings

Tierra Group performed a pre-investment technical tailings due diligence review.

Project Highlights:

  • Due Diligence
  • Tailings

Similar projects

Rosario Mine

Tierra Group performed a Dam Safety Review (DSR) including geotechnical investigations and seepage and slope stability analyses for a 20-m high TSF at this 300‑tpd underground polymetallic mine. The audit was prepared following the Mt. Polley tailings dam failure in…

VIEW PROJECT

Aurora TSF1 FPCP & TSF2 Closure Review

Tierra Group evaluated and prepared the closure design for Aurora's TSF1 facility. Design components included civil grading of closure surface, stability analysis of closure slopes, and hydraulic design of channels and spillways. A final design support was prepared by Tierra…

VIEW PROJECT

Camino Rojo Heap Leach Design

Tierra Group provided a heap leach facility detailed design (for construction), procurement, CQA and project management for the Camino Rojo Mine in Zacatecas, Mexico.

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT

Cerro Negro

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Mt. Todd Dam Assessment

Tierra Group conducted an Independent Technical review of Vista Gold Corp’s Mt. Todd Tailings Storage Facility Expansion in Northern Territory, Australia.

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.

VIEW PROJECT

Confidential Desktop Due Diligence Review

Tierra Group carried out a desktop Due Diligence review of a Preliminary Economic Assessment for a mine development project in the USA. Tierra Group’s review included; mine plan and production schedule, metallurgical testwork, process design, plant water balance, infrastructure updates, tailings…

VIEW PROJECT

Goldfield Bonanza Project

Lode-Star Gold, Inc., in advance of their proposed mining operations, submited a Physical Separation Facility application with the State of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine, located in the historic high-grade gold-bearing district of…

VIEW PROJECT

Midas Gold Project

Midas Gold’s project is located in the remote central Idaho Rockies near the town of Yellow Pine.  It is a brownfields gold-antimony project featuring three open pits and an anticipated 22,000 tpd plant throughput, along with challenging terrain and environmental…

VIEW PROJECT

La India Mine

Tierra Group performed geotechnical investigation, water balance, and the Phase 2 heap leach pad (HLP) optimization design at Agnico Eagle’s La India Mine in Sonora State Mexico. Tierra Group provided Construction Quality Assurance (CQA) during initial construction and expansion of…

VIEW PROJECT

Karouni Mine, Hicks 4 Phase 2

Tierra Group conducted a slope stability analysis for Troy Resources’ Hicks 4 Phase 2 North Wall Failure and provided recommendations for stable pit configurations.

VIEW PROJECT