  • Due Diligence
  • Tailings

Tierra Group performed a pre-investment technical tailings due diligence review.

Project Highlights:

  • Due Diligence
  • Tailings

Similar projects

2020 Annual Dams Inspection Aurora Mine

Tierra Group is the Engineer of Record (EoR) for two tailings dams at the Aurora Mine. Tierra Group provided annual dam safety inspections for the tailings dams to meet Nevada Division of Water Resources (NDWR) Dam Safety permit requirement. Work included…

VIEW PROJECT

Confidential Project - Brazil

Tierra Group performed a pre-investment technical tailings due diligence review.

VIEW PROJECT

McLaughlin WWRDF Seepage Collection

Tierra Group designed a Seepage Collection Systems (French Drains) to prevent contact water seepage from comingling with surface water runoff. The collected seepage was routed via pipelines to existing process water handling tanks.

VIEW PROJECT

Los Pelambres Tailings Stewardship

Tierra Group implemented a Corporate Tailings Stewardship Program at Antofagasta Minerals’ Los Pelambres Copper Mine in the Coquimbo Region of Chile. The program included data acquisition, a dam safety inspection, site-specific operations training, and improvement recommendations in tailings management practices.

VIEW PROJECT

Santa Pancha Mine

Tierra Group provided a desktop and field review of B2Gold’s Santa Pancha Mine hydrogeology. The review identified data gaps in site data and provided recommendations for improve an existing site hydrogeology model and improve underground water management. The hydrogeologic model…

VIEW PROJECT

Oracle Ridge Copper

Tierra Group represented Oracle Ridge Mining as the Qualified Person for portions of the feasibility-level design including the Dry Stack Tailings Storage Facility (TSF) Design, Site-Wide Stormwater Management, Water Supply Pipelines, Haul Road and Access Road Design Improvements, and the…

VIEW PROJECT

AranzazĂș Mine

The Aranzazú Mine is a copper-gold-silver mine located in the northeastern region of Zacatecas, Mexico. The mine includes both open pit and underground operations. The mill currently processes 2,600 tonnes of ore per day. Tierra Group finalized the geotechnical investigation…

VIEW PROJECT

Mt. Todd Dam Assessment

Tierra Group conducted an Independent Technical review of Vista Gold Corp’s Mt. Todd Tailings Storage Facility Expansion in Northern Territory, Australia.

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.

VIEW PROJECT

Dam Assessment

Tierra Group performed a site visit and visual inspection of a dam to assess its overall condition and provide the Owner recommendations for continued maintenance, monitoring, and improvements. The assessment was a follow-up to previous work completed by Tierra Group…

VIEW PROJECT

Buenaventura Photogrammetry Study for El Brocal Mine

Tierra Group developed a photogrammetry study and basic civil design for mining facilities layout at El Brocal Mine.

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…