Confidential Desktop Due Diligence Review

Project Highlights:

  • Process Design
  • Third-party Review
  • Mine Planning
  • Metallurgy
  • Risk Assessment
  • Conventional Tailings

Tierra Group carried out a desktop Due Diligence review of a Preliminary Economic Assessment for a mine development project in the USA. Tierra Group’s review included; mine plan and production schedule, metallurgical testwork, process design, plant water balance, infrastructure updates, tailings storage facility (TSF) updates, water treatment requirements, mine, TSF, and site geotechnical updates, permitting impacts, capital cost estimate, operating cost estimate, project execution plan and schedule, and risk assessment.

Project Highlights:

  • Process Design
  • Third-party Review
  • Mine Planning
  • Metallurgy
  • Risk Assessment
  • Conventional Tailings

Similar projects

Aurora TSF1 FPCP & TSF2 Closure Review

Tierra Group evaluated and prepared the closure design for Aurora's TSF1 facility. Design components included civil grading of closure surface, stability analysis of closure slopes, and hydraulic design of channels and spillways. A final design support was prepared by Tierra…

VIEW PROJECT

Confidential Project - Canada

Tierra Group conducted a Due Diligence Review for a project in Canada.

VIEW PROJECT

Turmalina Complex

Tierra Group developed a site-wide water management plan to improve operational water usage and management at Jaguar Mining's Turmalina Complex in Minas Gerais, Brazil. Turmalina is a zero-discharge facility that required optimizing tailings supernatant usage in the process, enhanced evaporation…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

Aurora Mine

The Aurora Mine Mill Facility (previously Esmeralda Mill) is located in the historic Aurora mining district of the eastern Sierra Nevada Mountain Range in Nevada, USA. Aurora recently, with the support of Tierra Group completed a Minor Modification to the…

VIEW PROJECT

Andina Veladero Engineering Review

Tierra Group performed a forensic study to determine the cause for volumetrically non-compliant leakage volumes occurring in the heap leach facilities leak detection system. Tierra Group reviewed the facility design, engineering and construction quality assurance (CQA) information, construction as built…

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT

Anglo American Quellaveco

Tierra Group supervised a geotechnical and hydrogeologic drilling investigation program at Anglo American’s Quellaveco Mine in the Moquegua Region of Peru.

VIEW PROJECT

Geotechnical Service for Area 2000

Tierra Group completed a collection of geomechanical field data (Inspections, mappings, sampling, testing, among others) for the tunnels, plant-mine road, areas at the base of the dump, access to tailings dam, truck shop slopes, bypass, and non-permanent accesses. The works…

VIEW PROJECT

Boleo Mine

Tierra Group performed an independent technical peer review of the Boleo Mine’s operating tailings storage facility design. In doing so Tierra Group identified several design modifications that when implemented for future stages will reduce sustaining capital cost expenditures by several…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

Don Mario Gold Mine

Don Mario Mine is an open pit gold/copper mine located in the Chiquitos Province, Santa Cruz, Bolivia that has been operating since 2002 and currently produces 2700 tpd mill throughput. Conventional tailings are transported and deposited in a high-density polyethylene lined geomembrane valley…

VIEW PROJECT