Project Highlights:
- Water Balance
- Feasibility Study
- Hydraulics
- Seismic Stability
- Water Management
- Hydrology
- Mine Planning
- Slope Stability Analysis
- Metallurgy
- Author NI 43-101 Technical Report
Tierra Group lead the Feasibility Study update for the Kiaka project. Tierra Group updated the TSF, WRD, hydrology / hydraulics, mine planning, and overall assembly and authoring of the updated NI 43-101 Technical Report.
Project Highlights:
- Water Balance
- Feasibility Study
- Hydraulics
- Seismic Stability
- Water Management
- Hydrology
- Mine Planning
- Slope Stability Analysis
- Metallurgy
- Author NI 43-101 Technical Report