Los Gatos TSF Management

Project Highlights:

  • EAP
  • Engineer of Record
  • OMS Manual

Tierra Group provided Engineer of Record services; including the development of Operations, Maintenance, and Surveillance (OMS) Manual, the development of an Emergency Action Plan (EAP), and annual operational support to the Los Gatos project in Mexico.

Project Highlights:

  • EAP
  • Engineer of Record
  • OMS Manual

Similar projects

Dam Assessment

Tierra Group performed a site visit and visual inspection of a dam to assess its overall condition and provide the Owner recommendations for continued maintenance, monitoring, and improvements. The assessment was a follow-up to previous work completed by Tierra Group…

VIEW PROJECT

Collection Pond Washdown Pad IFC Set

Tierra Group designed a concrete washdown pad connecting to the site’s existing collection pond. The pad was designed to allow the site to wash vehicles prior to them being approved to leave site.

VIEW PROJECT

Minera Plata Real | Los Gatos TSF Phase 2

Tierra Group designed a raise of the tailings storage facility (TSF) and provided construction quality assurance for the Los Gatos project in Chihuahua, Mexico.

VIEW PROJECT

Confidential Project - Armenia

Tierra Group International performed a Tailings Technical Due Diligence Review for a project in Armenia.

VIEW PROJECT

Marlin Mine

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…

VIEW PROJECT

Goldfield Bonanza Project

Lode-Star Gold, Inc., in advance of their proposed mining operations, submited a Physical Separation Facility application with the State of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine, located in the historic high-grade gold-bearing district of…

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT

Los Pelambres Tailings Stewardship

Tierra Group implemented a Corporate Tailings Stewardship Program at Antofagasta Minerals’ Los Pelambres Copper Mine in the Coquimbo Region of Chile. The program included data acquisition, a dam safety inspection, site-specific operations training, and improvement recommendations in tailings management practices.

VIEW PROJECT

Aurora Mine

The Aurora Mine Mill Facility (previously Esmeralda Mill) is located in the historic Aurora mining district of the eastern Sierra Nevada Mountain Range in Nevada, USA. Aurora recently, with the support of Tierra Group completed a Minor Modification to the…

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

AranzazĂș Mine

The Aranzazú Mine is a copper-gold-silver mine located in the northeastern region of Zacatecas, Mexico. The mine includes both open pit and underground operations. The mill currently processes 2,600 tonnes of ore per day. Tierra Group finalized the geotechnical investigation…

VIEW PROJECT

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT