Minera Plata Real | Los Gatos TSF Phase 2

Project Highlights:

  • Tailings Storage Facility (TSF) Design
  • Liner Design
  • Slope Stability Analysis
  • Construction Quality Assurance

Tierra Group designed a raise of the tailings storage facility (TSF) and provided construction quality assurance for the Los Gatos project in Chihuahua, Mexico.

Project Highlights:

  • Tailings Storage Facility (TSF) Design
  • Liner Design
  • Slope Stability Analysis
  • Construction Quality Assurance

Similar projects

La India Mine - CQA HLF Phase 3

Tierra Group performed Construction Quality Assurance (CQA) services for heap leach expansion Phase 3.

VIEW PROJECT

Mission Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…

VIEW PROJECT

Sterling Mine

Sterling Mine is an underground gold mine in southern Nevada which recovers gold through heap leaching and a carbon adsorption-desorption-recovery (ADR) plant. Tierra Group team members have a long history at Sterling, starting with heap leach pad final permanent closure…

VIEW PROJECT

Çöpler TSF/HLF Technical Review

Tierra Group provided an annual third-party tailings storage facility and heap leach facility technical review at Anagold’s Çöpler Gold Mine in Middle Anatolia, Turkey.

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

San Antonio HLF

Tierra Group provided detailed design and Construction Quality Assurance (CQA) services on a new heap leach pad at the San Antonio Project in Mexico.

VIEW PROJECT

El Diamante Hydropower Dam

Tierra Group conducted a Preliminary Site Assessment of a potential large-scale landslide near the El Diamante Hydropower Complex in Matagalpa, Nicaragua.

VIEW PROJECT

Caeté Complex

Tierra Group developed a site-wide water management plan, and performed a liquefaction potential study following the Samarco tailings dam failure in Minas Gerais, Brazil. A tailings storage facility water balance was developed to optimize water usage and minimize risks at…

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

Cosmo Howley

Newmarket Gold’s Cosmo Howley Project Area (CHPA) is a gold mine in the Northern Territory (NT), Australia. An underground mine is currently in operation with planned underground expansion. CHPA contains several legacy open pits, waste rock dumps, and surface water…

VIEW PROJECT

Stability Evaluation

Tierra Group performed geotechnical field investigation to support final design of the Stage 4 San Jose TSF and evaluate pit slope stability where Tajo Limon is nearest the San Jose TSF. Tierra Group incorporated field data into a 3-D geologic/geotechnical…

VIEW PROJECT