Morro do Ipe Due Diligence

Project Highlights:

  • Due Diligence
  • Tailings

Tierra Group served on an Independent Engineering Team performing a tailings management and operations Due Diligence Technical Review at the Morro do Ipe iron ore mine in Minas Gerais, Brazil.

Project Highlights:

  • Due Diligence
  • Tailings

Similar projects

Goldfield Bonanza Project

Lode-Star Gold, Inc. in advance of their proposed mining operations is preparing to submit a Physical Separation Facility application with the state of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine is located in the…

VIEW PROJECT

Brushy Creek 2

Tierra Group was commissioned by Doe Run to design a new tailings storage facility at the Brushy Creek Mine. Tierra Group completed a geotechnical investigation including boring, classifying, and sampling soil and rock. Trade-off studies were performed to minimize construction…

VIEW PROJECT

Tajo Crimea Project

Tierra Group is evaluating the geotechnical and hydrogeological characteristics of Tajo Crimea to evaluate the feasibility of using the open pit for tailings storage.  The project scope aims to define geotechnical site conditions, characterize site hydrogeology, and evaluate potential interaction…

VIEW PROJECT

Cove Project RIB Geotechnical Investigation

Tierra Group supported proposed Rapid Infiltration Basins Geotechnical Investigation at Au-reka Gold Corporation’s Cove Project in Nevada. Investigation included borehole drilling, test pits, infiltration testing and permeability testing.

VIEW PROJECT

Confidential Client - Argentina

Tierra Group was retained to perform metallurgical due diligence on two operating properties and two prospects in early stage development. The two existing operations consisted of a convention heap leach followed by ADR to produce a Dore on-site and a…

VIEW PROJECT

Fire Creek Mine

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As…

VIEW PROJECT

Confidential Client - Bulgaria

Confidential Client – Tierra Group performed a pre-investment Technical Due Diligence Review that included a detailed analysis and risk assessment for a 150-m high co-disposal (tailings and waste rock) storage facility. The facility included two 80-m high waste rock platforms…

VIEW PROJECT

Buritic√° Tailings Stewardship & Cyanide Speciation

Tierra Group provided Tailings Stewardship Services for Continental Gold’s Buriticá Project in Antioquia, Columbia which included permitting support, Third-Party Review and construction and operations support. Tierra Group oversaw the development of a 2D hydrodynamic model to support the design of…

VIEW PROJECT

Goldstrike Mine

Engineer of Record Barrick’s Goldstrike Mine processes 30,000 tons of gold ore per day from its combined open-pit/underground operations located in the historic Carlin Trend in Nevada, U.S.A. Goldstrike’s tailings are stored in the North Block Tailings Disposal Facility (NBTDF).…

VIEW PROJECT

Confidential Client - Turkey

Tierra Group International performed a Tailings Storage Facility Third Party Design Review for a confidential client in Turkey.

VIEW PROJECT

Tennessee Mines

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility; in Pickle Lake, Ontario, Canada.

VIEW PROJECT