Pan American Shahuindo Engineering Design

Project Highlights:

  • Hydraulics
  • Geotech Investigation
  • Hydrology
  • Geologic Mapping
  • Heap Leach

Tierra Group performed a detailed engineering design for a 4km access road and diversion channel, and the feasibility design for water diversion structures (including electrical and mechanical layout for a pump station). Tierra Group also performed a geotechnical investigation and updated the hydrological model.

Project Highlights:

  • Hydraulics
  • Geotech Investigation
  • Hydrology
  • Geologic Mapping
  • Heap Leach

Similar projects

Oracle Ridge Copper

Tierra Group represented Oracle Ridge Mining as the Qualified Person for portions of the feasibility-level design including the Dry Stack Tailings Storage Facility (TSF) Design, Site-Wide Stormwater Management, Water Supply Pipelines, Haul Road and Access Road Design Improvements, and the…

VIEW PROJECT

Stability Evaluation

Tierra Group performed geotechnical field investigation to support final design of the Stage 4 San Jose TSF and evaluate pit slope stability where Tajo Limon is nearest the San Jose TSF. Tierra Group incorporated field data into a 3-D geologic/geotechnical…

VIEW PROJECT

Brushy Creek 2

Tierra Group was commissioned by Doe Run to design a new tailings storage facility at the Brushy Creek Mine. Tierra Group completed a geotechnical investigation including boring, classifying, and sampling soil and rock. Trade-off studies were performed to minimize construction…

VIEW PROJECT

Black Butte Copper Project

Tierra Group performed a third-party design review of a Cemented Tailings Facility (CTF) and multiple process and freshwater ponds. Tailings will be mixed with cement at the planned paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT

Sterling Mine

Sterling Mine is an underground gold mine in southern Nevada which recovers gold through heap leaching and a carbon adsorption-desorption-recovery (ADR) plant. Tierra Group team members have a long history at Sterling, starting with heap leach pad final permanent closure…

VIEW PROJECT

Palmarejo Mine

Tierra Group performed an initial site visit to Coeur Mining’s Palmarejo Mine to conduct dam safety inspections of the tailings storage facility, environmental control dam, water diversion dam, and water diversion channel. Prior to the site visit, Tierra Group reviewed…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

Hollister Waste Rock Facility

Hollister Waste Rock Facility Storage Tierra Group performed a third-party peer review of a Waste Rock Storage Facility (WRSF) design at Klondex Mines’ (Klondex) Hollister Mine in northern Nevada. The WRSF, as designed, involved lining the mine’s existing West Pit…

VIEW PROJECT

Robinson Mine Trade-Off Study

Tierra Group completed a trade-off study to evaluate raising the existing Tailings Storage Facility (TSF) or building a new TSF at KGHM's Robinson Mine in White Pine County, Nevada. An Alternatives Decision Matrix (ADM) was developed using weighted qualitative and quantitative parameters…

VIEW PROJECT

Çöpler TSF and HLF Review - Turkey

Tierra Group provided an annual third-party tailings storage facility and heap leach facility technical review at Anagold’s Çöpler Gold Mine in Middle Anatolia, Turkey.

VIEW PROJECT