Project Track Technical Review

Project Highlights:

  • Due Diligence

Tierra Group conducted a pre-investment due diligence Technical Review including; Environmental, Permitting, and Social License; Geology and Mineral Resources; Mining and Reserves; Metallurgy and Process Design; Geotechnical, Hydrology, and Hydrogeology; Project Infrastructure, Heap Leach Facility, and Waste Disposal; and Capital and Operating Cost Estimates. A Technical Report was prepared including a an investment Risk Assessment and Risk Mitigation Matrix.

Project Highlights:

  • Due Diligence

Similar projects

Mexican Hat PEA Update

Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.

VIEW PROJECT

2020 TSF Annual Dam Inspection

Tierra Group completed an annual dam safety inspection (DSI) to meet both Nevada Division of Water Resources (NDWR) Dam Safety and the client's requirements. The DSI included reviewing monitoring data, a dam and appurtenant structures inspection, and a DSI report.

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT

Don Mario Gold Mine

Don Mario Mine is an open pit gold/copper mine located in the Chiquitos Province, Santa Cruz, Bolivia that has been operating since 2002 and currently produces 2700 tpd mill throughput. Conventional tailings are transported and deposited in a high-density polyethylene lined geomembrane valley…

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

Confidential Project - Bulgaria

Tierra Group performed a pre-investment Technical Due Diligence Review that included a detailed analysis and risk assessment for a 150-m high co-disposal (tailings and waste rock) storage facility. The facility included two 80-m high waste rock platforms upon which upstream…

VIEW PROJECT

Pitarrilla Mine

Tierra Group participated as a member of a multi-disciplinary project team to develop a Definitive Feasibility study for a 16,000 tpd silver mine in Durango, Mexico. Tierra Group's responsibilities included designing a 112 Mt tailings storage facility, developing a site-wide…

VIEW PROJECT

Cove Project RIB Geotechnical Investigation

Tierra Group supported proposed Rapid Infiltration Basins Geotechnical Investigation at Au-reka Gold Corporation’s Cove Project in Nevada. Investigation included borehole drilling, test pits, infiltration testing and permeability testing.

VIEW PROJECT

San Francisco Mine

Tierra Group conducted geo-electrical testing to locate leaks present in the geomembrane liners underlying a Solution Conveyance Canal, Sumps 1 and 2, and the Intermediate Pond at Timmins Gold Corp’s San Francisco Mine in Sonora, Mexico. Leak detection testing procedures…

VIEW PROJECT

La India Mine

Tierra Group performed geotechnical investigation, water balance, and the Phase 2 heap leach pad (HLP) optimization design at Agnico Eagle’s La India Mine in Sonora State Mexico. Tierra Group provided Construction Quality Assurance (CQA) during initial construction and expansion of…

VIEW PROJECT

Confidential Project - Nevada

Tierra Group led a multi-disciplinary team to provide a risk matrix which included Geotechnical, Hydrogeology, Hydrology, and Mining & Reserves for a project in Nevada, US.

VIEW PROJECT

Confidential Project - Nevada

Tierra Group provided the closure civil engineering design and associated surface water management for a project in Nevada. Tierra Group also provided permitting requirements to Nevada Department of Environmental Protection.

VIEW PROJECT