San Antonio HLF

Project Highlights:

  • CQA
  • Resident Engineering
  • Slope Stability Analysis
  • Heap Leach

Tierra Group provided detailed design and Construction Quality Assurance (CQA) services on a new heap leach pad at the San Antonio Project in Mexico.

Project Highlights:

  • CQA
  • Resident Engineering
  • Slope Stability Analysis
  • Heap Leach

Similar projects

Isabella Pearl Expansion Pit Slope Review

Tierra Group conducted an expansion pit slope review that included a technical memorandum of site observations/investigation, a review of past and new data, a basic slope analyses that developed recommendations for slope angles that determined if the Pit Expansion would…

VIEW PROJECT

Mexican Hat PEA Update

Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.

VIEW PROJECT

Camino Rojo Heap Leach Design

Tierra Group provided a heap leach facility detailed design (for construction), procurement, CQA and project management for the Camino Rojo Mine in Zacatecas, Mexico.

VIEW PROJECT

Los Filos Mine

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

El Aguila

Tierra Group performed a 3rd party engineering design peer review of a tailings storage facility expansion design. The review resulted in the owner realizing $650,000 in cost savings without compromising the facility's design integrity over the original design. Tierra Group also…

VIEW PROJECT

La Negra Mine

Tierra Group performed a tailings storage facility safety (TSF) audit for the 90 m high upstream constructed tailings dam at La Negra Mine in Querétaro, Mexico. The project included a TSF dam inspection and Dam Safety Inspection Report (DSIR) containing operational…

VIEW PROJECT

Peñasquito

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

La India Mine

Tierra Group performed geotechnical investigation, water balance, and the Phase 2 heap leach pad (HLP) optimization design at Agnico Eagle’s La India Mine in Sonora State Mexico. Tierra Group provided Construction Quality Assurance (CQA) during initial construction and expansion of…

VIEW PROJECT

La India TSF Feasibility Design

Tierra Group provided a feasibility-level Tailings Storage Facility (TSF) design for Condor Gold’s La India Project permitting, a planned 2,000 tpd open pit mine in western Nicaragua. TSF embankments used rockfill from the open pit and a geomembrane liner for…

VIEW PROJECT

Pan American Shahuindo Engineering Design

Tierra Group performed a detailed engineering design for a 4km access road and diversion channel, and the feasibility design for water diversion structures (including electrical and mechanical layout for a pump station). Tierra Group also performed a geotechnical investigation and updated…

VIEW PROJECT

Karouni Mine, Hicks 4 Phase 2

Tierra Group conducted a slope stability analysis for Troy Resources’ Hicks 4 Phase 2 North Wall Failure and provided recommendations for stable pit configurations.

VIEW PROJECT