Sepon Mine CQA

Project Highlights:

  • Heap Leach Pads
  • Construction Quality Assurance
  • Construction Quality Control

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

Project Highlights:

  • Heap Leach Pads
  • Construction Quality Assurance
  • Construction Quality Control

Similar projects

Pinos Altos Mine

Tierra Group provided slope stability analysis for Agnico Eagle’s dry stack tailings storage facility containing 330,000 tonnes of tailings.