Statement of Qualifications

Mankind lives on the earth. Everything built, either originated from, is built on, or interacts with, the earth. Geology is the science of the earth. Geotechnical Engineering is the application of geology and mathematics to use Earth’s natural resources to build infrastructure. Tierra Group International, Ltd. applies its geotechnical expertise to the conception, design, construction, and operations of physical structures for the mining industry, including:

  • Foundations
  • Tailings Dams
  • Water Dams
  • Heap Leach Pads
  • Mine Pits
  • Waste Rock Dumps
  • Hydraulic Structures (Canals, Channels, Pipelines, etc.)
  • Civil Infrastructure (Plants, Buildings, Roads, Bridges, etc.)

Tierra Group has applied its 100+ years combined professional geological and engineering expertise consulting on, or designing and constructing, dozens of these structures on six continents. This geographic variety has allowed Tierra Group’s Team to develop expertise designing facilities under challenging geotechnical conditions such as:

  • Laterites
  • Saprolites
  • Swelling or Collapsible Soils
  • Karst
  • Variable Geology
  • Highly and Active Seismicity (Earthquakes)
  • High Altitudes (4,000-m amsl)
  • Tropics

Tierra Group has innovatively adapted to these challenging environments using highly-trained professionals and state-of-the-art techniques and software to perform the following tasks and analyses:

  • Site Characterization
  • Soil/Rock Mechanics
  • Geologic Hazards - Landslide, Rock Fall, Avalanches, Seismic (Earthquakes)
  • Geotechnical Analyses - Slope, Stability, Seepage, Settlement, Consolidation, Deformation, Liquefaction
  • Civil Design and Specifications
  • Construction Documents
  • Resident Engineering
  • Quality Assurance
  • Operations Support
  • Forensics and Mitigation
  • Peer Reviews

Regardless of the geotechnical challenges posed, Tierra Group’s broad experience, intimate attention to site-specific conditions, and keen focus on developing innovative solutions, has earned us a respected reputation and loyal clients around the world.


Select Geotechnical Projects

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…

VIEW PROJECT

Masbate Mine

Tierra Group performed a study of Masbate’s 12-Mt tailings storage facility. Services provided included a forensic study to determine the cause of seepage through an abutment and performed an independent safety audit of tailings management practices. A risk analysis was performed…

VIEW PROJECT

Goldfield Bonanza Project

Lode-Star Gold, Inc., in advance of their proposed mining operations, submited a Physical Separation Facility application with the State of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine, located in the historic high-grade gold-bearing district of…

VIEW PROJECT

Tonopah Flats | Tailings Storage Facility

Tierra Group assisted with developing tailings disposal alternatives.

VIEW PROJECT

El Limón Mine

Tailings Storage Facility & Engineer of Record (2012-present) Tierra Group engineers provided engineering consultancy, design, and construction services for three Tailings Storage Facilities (TSF) (Santa Rosa, Santa Rosa West, and San José) to facilitate 20 years of uninterrupted mine operations. Tierra…

VIEW PROJECT

Hermosa Project

Tierra Group provided a Third-Party review of the Hermosa Project Tailings Storage Facility Design and Construction stages 1 & 2 in Patagonia, Arizona

VIEW PROJECT

Cerro Negro

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Peñasquito

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Newcrest Telfer Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Rosario Mine

Tierra Group performed a Dam Safety Review (DSR) including geotechnical investigations and seepage and slope stability analyses for a 20-m high TSF at this 300‑tpd underground polymetallic mine. The audit was prepared following the Mt. Polley tailings dam failure in…

VIEW PROJECT

Tajo Crimea Project

Tierra Group evaluated the Tajo Crimea Pit’s geotechnical and hydrogeological characteristics to determine in-pit tailings storage feasibility. The project scope defined geotechnical and hydrogeologic site conditions through field investigations and in-situ pump testing. Tierra Group developed a 3D groundwater model…

VIEW PROJECT

Ernesto e Pau-a-Pique

The Ernesto e Pau-a-Pique (EPP) Mine is located in the Municipality of Pontes e Lacerda, at 440 kms west of Cuiba City, Brazil. The mine is operated by Apoena Mining, a subsidiary of Aura Minerals Inc. Tierra Group was retained…

VIEW PROJECT