Esmeralda Mill

Project Highlights:

  • Tailings Dams
  • Geotechnical
  • Water Management
  • Permitting Support
  • Planning
  • Closure/Reclamation
  • Waste Rock Dumps
  • Construction Support

Tierra Group was contracted by Waterton Global Mining Company to prepare the FPCP for TSF No.1 at the Esmeralda Mine. TSF No.1 covered approximately 100 acres, included a rockfill embankment with a maximum height approximately 60 feet, and stored gold tailings. Work included summarizing tailings characterization data, completing the civil design for tailings regrading and closure soil cover placement, estimation of long-term soil loss using RUSLE, design and evaluation of a closure cover, design of a closure spillway capable of safely conveying the peak flow due to the 100-year 24-hour storm event, development of a surface water management plan, development of post-closure water management and monitoring plans, and writing the FPCP for submittal to Nevada Division of Environmental Protection (NDEP).

Project Highlights:

  • Tailings Dams
  • Geotechnical
  • Water Management
  • Permitting Support
  • Planning
  • Closure/Reclamation
  • Waste Rock Dumps
  • Construction Support

Similar projects

Black Butte Copper Project

Tierra Group performed a third-party design review of a Cemented Tailings Facility (CTF) and multiple process and freshwater ponds. Tailings will be mixed with cement at the planned paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT

Orotex Mine Project

Tierra Group provided tailings engineering design and consulting services for the redevelopment of the Orotex underground mine in Alajuela, Costa Rica. Tierra Group's areas of responsibility included tailings and water management in this environmentally sensitive, high rainfall, tropical, mountainous region.

VIEW PROJECT

Aurora TSF1 FPCP & TSF2 Closure Review

Tierra Group evaluated and prepared the closure design for Aurora's TSF1 facility. Design components included civil grading of closure surface, stability analysis of closure slopes, and hydraulic design of channels and spillways. A final design support was prepared by Tierra…

VIEW PROJECT

Hollister Waste Rock Facility

Hollister Waste Rock Facility Storage Tierra Group performed a third-party peer review of a Waste Rock Storage Facility (WRSF) design at Klondex Mines’ (Klondex) Hollister Mine in northern Nevada. The WRSF, as designed, involved lining the mine’s existing West Pit…

VIEW PROJECT

Copperstone Project

Tierra Group International, Ltd. participated as the geotechnical lead engineering firm for the Copperstone Project Pre-Feasibility Study (PFS) in Arizona, U.S.A. Tierra Group was responsible for tailings and waste rock storage, water management and underground geotechnics design and cost estimates…

VIEW PROJECT

Turmalina Complex

Tierra Group developed a site-wide water management plan to improve operational water usage and management at Jaguar Mining's Turmalina Complex in Minas Gerais, Brazil. Turmalina is a zero-discharge facility that required optimizing tailings supernatant usage in the process, enhanced evaporation…

VIEW PROJECT

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…

VIEW PROJECT

San Antonio HLF

Tierra Group provided detailed design and Construction Quality Assurance (CQA) services on a new heap leach pad at the San Antonio Project in Mexico.

VIEW PROJECT

Yauricocha Mine

The Yauricocha Mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

Lost Creek Project

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT

Confidential Project - Nevada

Tierra Group led a multi-disciplinary team to provide a risk matrix which included Geotechnical, Hydrogeology, Hydrology, and Mining & Reserves for a project in Nevada, US.

VIEW PROJECT