Statement of Qualifications

Civil engineering is designing, constructing, and maintaining physical structures, and comprises at least a partial component of nearly everything Tierra Group International, Ltd. does. Whether applying our core, geotechnical, water resources, or geologic hazards expertise, inevitably our work leads to modifications made to the natural environment or the construction of man-made structures. Tierra Group applies its civil engineering expertise to the conception, design, construction, and operations of physical structures such as:

  • Tailings Dams
  • Water Dams
  • Heap Leach Pads
  • Waste Rock Dumps
  • Retaining Walls
  • Hydraulic Structures - Canals, Channels, Head Structures, Culverts, Pipelines, and Ponds
  •  Infrastructure - Foundations, Roads, Bridge Abutments

Tierra Group has applied our professional civil engineering expertise designing and constructing dozens of these structures on six continents. This geographic variety has allowed Tierra Group’s Team to develop expertise designing facilities under a variety of challenging geotechnical conditions and climates, such as:

  • Laterites
  • Saprolites
  • Swelling or Collapsible Soils
  • Karst
  • High and Active Seismicity (Earthquakes)
  • High Altitudes (4,000 masl)
  • Tropics

Tierra Group has innovatively adapted to these challenging environments using highly-trained professionals and state-of-the-art techniques and software to execute the following:

  • Conceptual Plans
  • Feasibility Designs
  • Final Engineering Designs
  • “For Construction” Drawings
  • Construction Specifications
  • Resident Engineering
  • Quality Assurance

Regardless of the engineering challenges posed, Tierra Group’s broad experience, intimate attention to site-specific conditions, and keen focus on developing innovative solutions has earned us a respected reputation and loyal clients around the world.


Select Civil Projects

El Gallo Mine

El Gallo is a 3,000 tpd open-pit gold/silver mine located in the foothills of the Sierra Madre Mountain Range in Mexico’s  Sinaloa  state.  Gold  recovery  is  through  heap  leaching  and  adsorption/desorption/recovery  (ADR). Production commencement at El Gallo started with the…

VIEW PROJECT

La Negra Mine

Tierra Group performed a tailings storage facility safety (TSF) audit for the 90 m high upstream constructed tailings dam at La Negra Mine in Querétaro, Mexico. The project included a TSF dam inspection and Dam Safety Inspection Report (DSIR) containing operational…

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.

VIEW PROJECT

Copperstone Project

Tierra Group International, Ltd. participated as the geotechnical lead engineering firm for the Copperstone Project Pre-Feasibility Study (PFS) in Arizona, U.S.A. Tierra Group was responsible for tailings and waste rock storage, water management and underground geotechnics design and cost estimates…

VIEW PROJECT

Tajo Crimea Project

Tierra Group is evaluating the geotechnical and hydrogeological characteristics of Tajo Crimea to evaluate the feasibility of using the open pit for tailings storage.  The project scope aims to define geotechnical site conditions, characterize site hydrogeology, and evaluate potential interaction…

VIEW PROJECT

Pierina Mine

Barrick Gold Corporation’s Pierina Mine in Ancash Department, Perú began operations in 1998. A progressive reclamation and closure plan began in 2013.  In 2015-16 Tierra Group developed detailed engineering designs for channels, sediment traps, two 45,000 m3 sediment ponds, water…

VIEW PROJECT

Yauricocha Mine

The Yauricocha mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

Don Mario Gold Mine

Don Mario mine is an open pit gold/copper mine located in the Chiquitos Province, Santa Cruz, Bolivia. Don Mario mine has been operating since 2002 and currently produces 2700 tpd mill throughput. Conventional tailings are transported and deposited in a…

VIEW PROJECT

Karouni Mine

Pit Design Review Tierra Group reviewed and provided pit slope recommendations and conducted hydrological assessments for the Resource 1 and 2 deposits water management system at Troy Resources’ Karouni Mine (Karouni). Advanced pre-feasibility level recommendations for pit development were provided…

VIEW PROJECT

Los Filos Mine

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Myra Falls

Tierra Group provides Tailings Stewardship Services for Nyrstar's Myra Falls Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, site training and in depth inspections of management practices and facilities…

VIEW PROJECT

Black Butte Copper Project

Tierra Group performed a third-party design review of a Cemented Tailings Facility (CTF) and multiple process and freshwater ponds. Tailings will be mixed with cement at the planned paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT