Tennessee Mines

Project Highlights:

  • Dam Safety Review

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to evaluate current and past performance of the facility related to dam safety. Tierra Group’s primary duty was to perform a Dam Safety Inspection, Documents Review, Operations Staff Interviews and Training, and a Dam Safety Report.  Nyrstar Tennessee Mines’ operations are divided into two sets of assets, known individually as Middle Tennessee (MTN) and East Tennessee (ETN). MTN and ETN operations each consist of three individual mines, a mill, TSFs, and maintenance and support functions.

Project Highlights:

  • Dam Safety Review

Similar projects

Los Gatos Project

Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico.

VIEW PROJECT

Fekola Project

Tierra Group provided earthworks and concrete Construction Quality Control (CQC) services for B2Gold's Fekola Mine in western Mali. Tierra Group overcame the remote location and kept a dedicated team on-site throughout the 2-year mine development. Tierra Group assisted Fekola Mine…

VIEW PROJECT

Marlin Mine

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…

VIEW PROJECT

La Libertad Mine

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage…

VIEW PROJECT

Sweetwater Mine

Sweetwater Mine Permitting Tierra Group’s Team began work at the Sweetwater mine in 1993 assisting permitting and developing tailings impoundment management strategies for the mine. We successfully designed and installed an innovative internal seal for repair of the mine’s damaged…

VIEW PROJECT

Hecla WWR 5840’ Raise EDC

Tierra Group prepared an engineering design change to increase the maximum elevation permitted for the mine’s existing WWR. Project included a waste rock dump expansion civil design and stability modeling to verify design complied with regulatory dam safety criteria.

VIEW PROJECT

Confidential Project - Argentina

Tierra Group was retained to perform metallurgical due diligence on two operating properties and two prospects in early stage development. The two existing operations consisted of a convention heap leach followed by ADR to produce a Dore on-site and a…

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

Don Mario Gold Mine

Don Mario Mine is an open pit gold/copper mine located in the Chiquitos Province, Santa Cruz, Bolivia that has been operating since 2002 and currently produces 2700 tpd mill throughput. Conventional tailings are transported and deposited in a high-density polyethylene lined geomembrane valley…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

Los Pelambres Tailings Stewardship

Tierra Group implemented a Corporate Tailings Stewardship Program at Antofagasta Minerals’ Los Pelambres Copper Mine in the Coquimbo Region of Chile. The program included data acquisition, a dam safety inspection, site-specific operations training, and improvement recommendations in tailings management practices.

VIEW PROJECT

Andina Veladero Engineering Review

Tierra Group performed a forensic study to determine the cause for volumetrically non-compliant leakage volumes occurring in the heap leach facilities leak detection system. Tierra Group reviewed the facility design, engineering and construction quality assurance (CQA) information, construction as built…

VIEW PROJECT