Tailings Review & Assurance Audit | Montana

Project Highlights:

  • Independent Engineering Review
  • Tailings Storage Facilities
  • Tailings Assurance Audit

Tailings Management Assurance Review

Tierra Group served as the Lead Auditor and conducted MARs for the TSFs at this confidential project. Tierra Group reviewed all available facility documentation, including OMS Manuals, EAPs, design reports, As-Built Reports, annual inspection reports, and other relevant documentation in determining each site’s compliance with the Company’s Tailings and Heap Leach Management Standard.

Independent Engineer's Review

Tierra Group personnel served as the Audit Lead to review tailings management procedures and compared them to standards outlined in the Company’s Corporate Tailings and Heap Leach Management Standard.

Tailings Assurance Audit

Tierra Group completed a Tailings Assurance Audit (TAA) for Tailings Storage Facility 2 (TSF2). The TAA was completed to ensure the TSF and site operations complied with the Company’s Tailings Management Standard, which closely mirrors Global Industry Standard on Tailings Management (GISTM) requirements. 

Project Highlights:

  • Independent Engineering Review
  • Tailings Storage Facilities
  • Tailings Assurance Audit

Similar projects

Yauricocha Mine

The Yauricocha Mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

Dam Low Level Outlet Replacement

Tierra Group completed a geotechnical investigation, which included overseeing hollow stem auger (HSA) drilling and laboratory testing, that characterized the existing earthen dam. Tierra Group completed a low-level outlet structure design that was believed to have been compromised by internal…

VIEW PROJECT

Douglas County, CO | 2020 Stormwater Support

Tierra Group provided engineering and permitting support to Douglas County Public Works Engineering for NPDES Phase II Program compliance. Tierra Group’s scope of work included developing Runoff Control Plans (RCPs) for new County facilities, updating RCPs at existing County facilities,…

VIEW PROJECT

Cove Project RIB Geotechnical Investigation

Tierra Group supported proposed Rapid Infiltration Basins Geotechnical Investigation at Au-reka Gold Corporation’s Cove Project in Nevada. Investigation included borehole drilling, test pits, infiltration testing and permeability testing.

VIEW PROJECT

Mission Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

Fire Creek Mine

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As…

VIEW PROJECT

Lagunas Norte Mine

The Lagunas Norte Mine, operated by Barrick Misquichilca S.A., is an open pit gold mine located in the Quiruvilca district, Santiago de Chuco province, La Libertad department, Perú. The main study objective was to evaluate the volume of effluent discharge…

VIEW PROJECT

NioCorp’s Elk Creek | Tailings Storage Facility (TSF) Feasibility Study

Tierra Group advanced the TSF design to a Feasibility Level according to the Canadian National Instrument NI 43-101 and the U.S. Security and Exchange Commission’s Subpart SK-1300 regulation. Tierra Group’s scope of work included a geotechnical investigation, engineering analysis, and TSF…

VIEW PROJECT

North Mara Mine | Tailings Assurance Audit

Tierra Group completed a TAA for the North Mara Tailings Storage Facility (TSF). The TAA was completed to ensure the TSF and site operations complied with Barrick’s Tailings Management Standard, which closely mirrors the Global Industry Standard on Tailings Management (GISTM)…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…

VIEW PROJECT

Hayden Operations

Tierra Group implemented a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview operations staff,…

VIEW PROJECT

Midas Gold Project

Midas Gold’s project is located in the remote central Idaho Rockies near the town of Yellow Pine.  It is a brownfields gold-antimony project featuring three open pits and an anticipated 22,000 tpd plant throughput, along with challenging terrain and environmental…

VIEW PROJECT