Bolivar Mine

Project Highlights:

  • Tailings Testing
  • Tailings Dewatering
  • Process Design

The Bolivar mine is a 3,000 tonne per day underground mining operation in Chihuahua, Mexico producing copper, zinc, silver, and gold. Space constraints in mountainous terrain require dewatering tailings to reduce required area for tailings storage. Tierra Group is assisting Sierra Metals with process upgrades including tailings dewatering and storage. Tierra Group is completing a conceptual study to determine the most cost effective dewatering solution that fits with the current plant operations and future plans. Engineering design includes specialized tailings testing, flowsheet development, equipment specification, cost estimate, and delivery/construction schedule estimation.

Project Highlights:

  • Tailings Testing
  • Tailings Dewatering
  • Process Design

Similar projects

Equity Silver ITRB

Tierra Group's Matt Fuller, LEG, P.Geo. serves as one of three ITRB technical experts providing technical assurance of the Engineer of Record’s design and monitoring compliance with BC regulations, the Newmont Corporate Tailings Standard, and industry best practices.

VIEW PROJECT

Çöpler TSF/HLF Technical Review

Tierra Group provided an annual third-party tailings storage facility and heap leach facility technical review at Anagold’s Çöpler Gold Mine in Middle Anatolia, Turkey.

VIEW PROJECT

Masbate Mine

Tierra Group performed a study of Masbate’s 12-Mt tailings storage facility. Services provided included a forensic study to determine the cause of seepage through an abutment and performed an independent safety audit of tailings management practices. A risk analysis was performed…

VIEW PROJECT

Caeté Complex

Tierra Group developed a site-wide water management plan, and performed a liquefaction potential study following the Samarco tailings dam failure in Minas Gerais, Brazil. A tailings storage facility water balance was developed to optimize water usage and minimize risks at…

VIEW PROJECT

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT

Minera Plata Real | Los Gatos Project

Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico.

VIEW PROJECT

Minera Plata Real | Los Gatos TSF Phase 2

Tierra Group designed a raise of the tailings storage facility (TSF) and provided construction quality assurance for the Los Gatos project in Chihuahua, Mexico.

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

Freeboard Reduction

Tierra Group performed calculations and developed a technical memorandum requesting temporary authorization to impund within the current stage freeboard limits.

VIEW PROJECT

Myra Falls

Tierra Group provides Tailings Stewardship Services for Nyrstar's Myra Falls Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, site training and in depth inspections of management practices and facilities…

VIEW PROJECT

Hecla WWR 5840’ Raise EDC

Tierra Group prepared an engineering design change to increase the maximum elevation permitted for the mine’s existing WWR. Project included a waste rock dump expansion civil design and stability modeling to verify design complied with regulatory dam safety criteria.

VIEW PROJECT

El Aguila

Tierra Group performed a 3rd party engineering design peer review of a tailings storage facility expansion design. The review resulted in the owner realizing $650,000 in cost savings without compromising the facility's design integrity over the original design. Tierra Group also…

VIEW PROJECT