Morelos Mine

Project Highlights:

  • Geotechnical Investigation
  • Stability Analysis
  • Annual Inspection
  • Dry Stack Tailings Monitoring

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings. Tierra Group analyzed instrumentation data, developed quarterly Monitoring Reports, performed slope stability analysis, and annual inspections to assure the safety and structural stability for the 14,000 tpd (ultimately) dry stack TSF in Guerrero, Mexico.

Project Highlights:

  • Geotechnical Investigation
  • Stability Analysis
  • Annual Inspection
  • Dry Stack Tailings Monitoring

Similar projects

Masbate Mine

Tierra Group performed a due diligence study of Masbateā€™s 12-Mt tailings storage facility. Services provided included a forensic study to determine the cause of seepage through an abutment and performed an independent safety audit of tailings management practices. A risk…

VIEW PROJECT

La India TSF Feasibility Design

Tierra Group provided a feasibility-level Tailings Storage Facility (TSF) design for Condor Gold’s La India Project permitting, a planned 2,000 tpd open pit mine in western Nicaragua. TSF embankments used rockfill from the open pit and a geomembrane liner for…

VIEW PROJECT

El Mochito Mine

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided…

VIEW PROJECT

Confidential Client - Argentina

Tierra Group was retained to perform metallurgical due diligence on two operating properties and two prospects in early stage development. The two existing operations consisted of a convention heap leach followed by ADR to produce a Dore on-site and a…

VIEW PROJECT

Confidential Client - Bulgaria

Confidential Client – Tierra Group performed a pre-investment Technical Due Diligence Review that included a detailed analysis and risk assessment for a 150-m high co-disposal (tailings and waste rock) storage facility. The facility included two 80-m high waste rock platforms…

VIEW PROJECT

Tajo Crimea Project

Tierra Group is evaluating the geotechnical and hydrogeological characteristics of Tajo Crimea to evaluate the feasibility of using the open pit for tailings storage.  The project scope aims to define geotechnical site conditions, characterize site hydrogeology, and evaluate potential interaction…

VIEW PROJECT

Robinson Mine Trade-Off Study

Tierra Group completed a trade-off study to evaluate raising the existing Tailings Storage Facility (TSF) or building a new TSF at KGHM's Robinson Mine in White Pine County, Nevada. An Alternatives Decision Matrix (ADM) was developed using weighted qualitative and quantitative parameters…

VIEW PROJECT

Goldstrike Mine

Engineer of Record Barrick’s Goldstrike Mine processes 30,000 tons of gold ore per day from its combined open-pit/underground operations located in the historic Carlin Trend in Nevada, U.S.A. Goldstrike’s tailings are stored in the North Block Tailings Disposal Facility (NBTDF).…

VIEW PROJECT

El Diamante Hydropower Dam

Tierra Group conducted a Preliminary Site Assessment of a potential large-scale landslide near the El Diamante Hydropower Complex in Matagalpa, Nicaragua.

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT

San Albino Dry Stack Tailings Storage Facility Design

Tierra Group is supporting construction of the San Albino mine in Nueva Segovia, Nicaragua. Tierra Group is designing a dry stack drum filtered-tailings storage facility. A siting study is planned to optimize the dry stack location and minimize CAPEX and…

VIEW PROJECT

Pirquitas Tailings Review

Tierra Group prepared a civil engineering design for SSR Mining’s Mina Pirquitas in Jujuy Province, Argentina and developed current and future water-mass balance through hydrological/hydraulics calculations and modeling. Tierra Group developed the ultimate tailings surface, deposition plan, spillway relocation analysis,…

VIEW PROJECT