Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.
Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.
Tierra Group provided Tailings Stewardship Services for Continental Gold’s Buriticá Project in Antioquia, Columbia which included permitting support, Third-Party Review and construction and operations support. Tierra Group oversaw the development of a 2D hydrodynamic model to support the design of…
Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…
Tierra Group provided the closure civil engineering design and associated surface water management for a project in Nevada. Tierra Group also provided permitting requirements to Nevada Department of Environmental Protection.
Tierra Group conducted a Due Diligence Review for a project in Wisconsin, US.
Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…
Tierra Group conducted a pre-investment due diligence Technical Review including; Environmental, Permitting, and Social License; Geology and Mineral Resources; Mining and Reserves; Metallurgy and Process Design; Geotechnical, Hydrology, and Hydrogeology; Project Infrastructure, Heap Leach Facility, and Waste Disposal; and Capital…
Tierra Group completed a trade-off study to evaluate raising the existing Tailings Storage Facility (TSF) or building a new TSF at KGHM's Robinson Mine in White Pine County, Nevada. An Alternatives Decision Matrix (ADM) was developed using weighted qualitative and quantitative parameters…
Tierra Group participated as a member of a multi-disciplinary project team to develop a Definitive Feasibility study for a 16,000 tpd silver mine in Durango, Mexico. Tierra Group's responsibilities included designing a 112 Mt tailings storage facility, developing a site-wide…
Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage…
Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.
Tierra Group supported proposed Rapid Infiltration Basins Geotechnical Investigation at Au-reka Gold Corporation’s Cove Project in Nevada. Investigation included borehole drilling, test pits, infiltration testing and permeability testing.