Aurora Mine

Project Highlights:

  • Engineer of Record
  • Tailings Dams
  • Water Management
  • Permitting Support
  • Closure
  • Tailings Storage Facility

The Aurora Mine Mill Facility (previously Esmeralda Mill) is located in the historic Aurora mining district of the eastern Sierra Nevada Mountain Range in Nevada, USA. Aurora recently, with the support of Tierra Group completed a Minor Modification to the Mine’s Water Pollution Control Permit (WPCP) to recommence operation of the Mine’s mill and allow the processing of historical tailings from Tailings Storage Facility 1 (TSF1). The reprocessed mill tailings will be deposited in Tailings Storage Facility 2 (TSF2) which is a fully lined tailings facility commissioned in 2012. Both tailings facilities are comprised of a jurisdictional tailings dam. Tierra Group serves as the Engineer of Record for both dams. Modifications to the WPCP designed by Tierra Group also included a new concrete containment pad, relining of several ponds, and preparation of a revised closure plan for TSF1.

Tailings management at Aurora is unique and challenging due to its high elevation (7,000 feet amsl) in a high seismic region with a relatively arid climate that experiences snowfall during winter months. As Engineer of Record, Tierra Group provides engineering consultancy, design and construction related engineering services for both of Aurora’s TSFs.

Project Highlights:

  • Engineer of Record
  • Tailings Dams
  • Water Management
  • Permitting Support
  • Closure
  • Tailings Storage Facility

Similar projects

Lost Creek Project

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT

American Gypsum

American Gypsum Pit Planning and Support Tierra Group began working at American Gypsum’s Eagle-Gypsum mine located in Gypsum, Colorado in 2014 evaluating haul road improvements. A tradeoff study was completed providing a tool that American Gypsum used to evaluate safety…

VIEW PROJECT

Tajo Crimea Project

Tierra Group is evaluating the geotechnical and hydrogeological characteristics of Tajo Crimea to evaluate the feasibility of using the open pit for tailings storage.  The project scope aims to define geotechnical site conditions, characterize site hydrogeology, and evaluate potential interaction…

VIEW PROJECT

Palmarejo Mine

Tierra Group performed an initial site visit to Couer Mining’s Palmarejo Mine to conduct dam safety inspections of the tailings storage facility, environmental control dam, water diversion dam, and water diversion channel. Prior to the site visit, Tierra Group reviewed…

VIEW PROJECT

Oracle Ridge Copper

Tierra Group represented Oracle Ridge Mining as the Qualified Person for portions of the feasibility-level design including the Dry Stack Tailings Storage Facility (TSF) Design, Site-Wide Stormwater Management, Water Supply Pipelines, Haul Road and Access Road Design Improvements, and the…

VIEW PROJECT

Robinson Mine Trade-Off Study

Tierra Group completed a trade-off study to evaluate raising the existing Tailings Storage Facility (TSF) or building a new TSF at KGHM's Robinson Mine in White Pine County, Nevada. An Alternatives Decision Matrix (ADM) was developed using weighted qualitative and quantitative parameters…

VIEW PROJECT

Pirquitas Tailings Review

Tierra Group prepared a civil engineering design for SSR Mining’s Mina Pirquitas in Jujuy Province, Argentina and developed current and future water-mass balance through hydrological/hydraulics calculations and modeling. Tierra Group developed the ultimate tailings surface, deposition plan, spillway relocation analysis,…

VIEW PROJECT

Brushy Creek

Tierra Group is providing Doe Run a raise design for the Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design,…

VIEW PROJECT

Esmeralda Mill

Tierra Group was contracted by Waterton Global Mining Company to prepare the FPCP for TSF No.1 at the Esmeralda Mine. TSF No.1 covered approximately 100 acres, included a rockfill embankment with a maximum height approximately 60 feet, and stored gold tailings. Work…

VIEW PROJECT

Masbate Mine

Tierra Group performed a due diligence study of Masbateā€™s 12-Mt tailings storage facility. Services provided included a forensic study to determine the cause of seepage through an abutment and performed an independent safety audit of tailings management practices. A risk…

VIEW PROJECT

Pitarrilla Mine

Tierra Group participated as a member of a multi-disciplinary project team to develop a Definitive Feasibility study for a 16,000 tpd silver mine in Durango, Mexico. Tierra Group's responsibilities included designing a 112 Mt tailings storage facility, developing a site-wide…

VIEW PROJECT

Orotex Mine Project

Tierra Group is providing tailings engineering design and consulting services for the redevelopment of the Orotex underground mine in Alajuela, Costa Rica. Tierra Group's areas of responsibility include tailings and water management in this environmentally sensitive, high rainfall, tropical, mountainous…

VIEW PROJECT