Bald Mountain Mine

Project Highlights:

  • Heap Leach Facility
  • Trade-off Study

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner drainage media in future heap leach pad construction and/or expansion. Construction costs, environmental impacts, permitting and other implications were considered in the study.

Project Highlights:

  • Heap Leach Facility
  • Trade-off Study

Similar projects

Stillwater Mining Company

Tierra Group performed a TSF Design Review to support a NI 43-101 compliant Feasibility Study. The TSF design incorporated a paste tailings disposal method in an environmentally sensitive fisheries habitat in south-central Montana.

VIEW PROJECT

Turmalina Complex

Tierra Group developed a site-wide water management plan to improve operational water usage and management at Jaguar Mining's Turmalina Complex in Minas Gerais, Brazil. Turmalina is a zero-discharge facility that required optimizing tailings supernatant usage in the process, enhanced evaporation…

VIEW PROJECT

Kiaka Feasibility Study Update

Tierra Group led the Feasibility Study update for the Kiaka project. Tierra Group  updated the TSF, WRD, hydrology / hydraulics, mine planning, and overall assembly and authoring of the updated NI 43-101 Technical Report.

VIEW PROJECT

Robinson Mine Trade-Off Study

Tierra Group completed a trade-off study to evaluate raising the existing Tailings Storage Facility (TSF) or building a new TSF at KGHM's Robinson Mine in White Pine County, Nevada. An Alternatives Decision Matrix (ADM) was developed using weighted qualitative and quantitative parameters…

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

Geotechnical Service for Area 2000

Tierra Group completed a collection of geomechanical field data (Inspections, mappings, sampling, testing, among others) for the tunnels, plant-mine road, areas at the base of the dump, access to tailings dam, truck shop slopes, bypass, and non-permanent accesses. The works…

VIEW PROJECT

El Cubo

Tierra Group provided Tailings Stewardship Services including a dam inspection, slope stability analysis review and operational improvements for Endeavour Silver’s El Cubo tailings storage facility in Guanajuato, Mexico.

VIEW PROJECT

Collection Pond Washdown Pad IFC Set

Tierra Group designed a concrete washdown pad connecting to the site’s existing collection pond. The pad was designed to allow the site to wash vehicles prior to them being approved to leave site.

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT

La Libertad Mine

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage…

VIEW PROJECT

Midas Gold Project

Midas Gold’s project is located in the remote central Idaho Rockies near the town of Yellow Pine.  It is a brownfields gold-antimony project featuring three open pits and an anticipated 22,000 tpd plant throughput, along with challenging terrain and environmental…

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT