Mascota Mine

Project Highlights:

  • Heap Leach Design
  • Civil Design
  • Geotechnical Investigation
  • Water Balance
  • Buttress Design
  • Construction Quality Assurance

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico Eagle’s Mascota Mine 5,000 tpd heap leach pad (combined with Pinos Altos ore) in Chihuahua, Mexico. In addition, Tierra Group provided Construction Quality Assurance (CQA) services for phase 3 and phase 4 pad construction.

Phase 5 Heap Leach Pad is an expansion of Phase 4 with a proposed capacity of 2 to 3 million tons (Mt) of crushed ore. The project includes development of construction drawings and technical specifications to be used for the construction of the facility. The design includes slope stability analyses, seepage analyses, water balance to verify the size of existing ponds, and stormwater management to design diversion channels.

Tierra Group will also provide Construction Quality Assurance (CQA) services for the construction of the heap expansion, including construction observation, clay placement and compaction, and liner installation.

Project Highlights:

  • Heap Leach Design
  • Civil Design
  • Geotechnical Investigation
  • Water Balance
  • Buttress Design
  • Construction Quality Assurance

Similar projects

Lost Creek Project | USA

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT

Pinos Altos Mine

Tierra Group provided slope stability analysis for Agnico Eagle’s dry stack tailings storage facility containing 330,000 tonnes of tailings.

VIEW PROJECT

Mt. Todd Dam Assessment

Tierra Group conducted an Independent Technical review of Vista Gold Corp’s Mt. Todd Tailings Storage Facility Expansion in Northern Territory, Australia. Tierra Group assisted the 2025 Mt. Todd feasibility study project providing TSF and waste rock dump design and water…

VIEW PROJECT

Bunker Hill

Dry Stack Tailings Storage Facility Tierra Group designed a dry stack TSF to store excess tailings from the underground paste backfill. The dry stack TSF was challenging, given the limited land area, steep terrain, seasonal cold weather, and surface water…

VIEW PROJECT

Campo Morado Mine

Dam Safety Review Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage…

VIEW PROJECT

La Trinidad

Tierra Group began work at La Trinidad providing heap leach pad construction recommendations and a water balance. Tierra Group continued support with a heap leach pad expansion design, slope stability analyses, hydrologic analyses, diversion design, liner design, and leach solution…

VIEW PROJECT

Fire Creek Mine

Tierra Group conducted a siting analysis for a new WRSF to support the mine’s future production increase as part of the Preliminary Feasibility Study (PFS). In addition to supporting the PFS, Tierra Group assisted in preparing and submitting several engineering…

VIEW PROJECT

Robinson Mine

Robinson Mine Tailings Impoundment Audit Prior to joining Tierra Group, our Team completed a third-party tailings impoundment audit. The audit included reviewing operational procedures, monitoring, design, and future tailings storage planning. Produced an audit report for company’s internal use. (Tetra Tech,…

VIEW PROJECT

Dam Assessment

Tierra Group performed a site visit and visual inspection of a dam to assess its overall condition and provide the Owner recommendations for continued maintenance, monitoring, and improvements. The assessment was a follow-up to previous work completed by Tierra Group…

VIEW PROJECT

Condor Gold | La India TSF Feasibility Design

Tierra Group provided a feasibility-level Tailings Storage Facility (TSF) design for Condor Gold’s La India Project permitting, a planned 2,000 tpd open pit mine in western Nicaragua. TSF embankments used rockfill from the open pit and a geomembrane liner for…

VIEW PROJECT

Newcrest Red Chris Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT