La Libertad Mine

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage 6 and 7 dam crest raise designs incorporated mechanically stabilized earth (MSE) methods to maintain the facility within property boundaries, and reduce construction costs. Tierra Group also developed the detailed closure design for the Esperanza TSF. 

Tierra Group serves as the Engineer of Record (EoR) for the Esperanza TSF. As the EoR, Tierra Group conducted TSF dam breach and downstream inundation analyses, developed detailed TSF water balance, reviewed monthly monitoring data, conducted annual TSF inspections, and prepared an annual monitoring report to document TSF performance and dam safety.

Crimea In-Pit Tailings Storage Facility (TSF)

Tierra Group developed the Crimea In-Pit TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the Crimea In-Pit TSF.

La Esperanza Tailings Storage Facility (TSF)

Tierra Group updated the La Esperanza TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the La Esperanza TSF.

Crimea In-Pit Tailings Storage Facility (TSF) Phase 2 Geotechnical Investigation

Tierra Group completed a geotechnical field investigation to support the Crimea TSF Phase 2 design. Field investigation included exploratory borings, trenches, and laboratory testing on dam foundation materials and proposed borrow sources.

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Similar projects

Bolanitos

Tierra Group provided Tailings Stewardship Services including a dam inspection, slope stability analysis review and operational improvements for Endeavour Silver’s Bolanitos tailings storage facility.

VIEW PROJECT

Peñasquito

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Dam Low Level Outlet Replacement

Tierra Group completed a geotechnical investigation, which included overseeing hollow stem auger (HSA) drilling and laboratory testing, that characterized the existing earthen dam. Tierra Group completed a low-level outlet structure design that was believed to have been compromised by internal…

VIEW PROJECT

Caeté Complex

Tierra Group developed a site-wide water management plan, and performed a liquefaction potential study following the Samarco tailings dam failure in Minas Gerais, Brazil. A tailings storage facility water balance was developed to optimize water usage and minimize risks at…

VIEW PROJECT

Bunker Hill

Dry Stack Tailings Storage Facility Tierra Group designed a dry stack TSF to store excess tailings from the underground paste backfill. The dry stack TSF was challenging, given the limited land area, steep terrain, seasonal cold weather, and surface water…

VIEW PROJECT

Don Mario Gold Mine

Don Mario Mine is an open pit gold/copper mine located in the Chiquitos Province, Santa Cruz, Bolivia that has been operating since 2002 and currently produces 2700 tpd mill throughput. Conventional tailings are transported and deposited in a high-density polyethylene lined geomembrane valley…

VIEW PROJECT

Camino Rojo

Heap Leach Procurement & Construction Quality Assurance Tierra Group provided Issued for Construction (IFC) design drawings and specifications for procurement requirements for the expansion of the Camino Rojo HLF. Information required included liner specifications, drainage collection piping, and quantities. Additionally,…

VIEW PROJECT

San Francisco Mine

Tierra Group conducted geo-electrical testing to locate leaks present in the geomembrane liners underlying a Solution Conveyance Canal, Sumps 1 and 2, and the Intermediate Pond at Timmins Gold Corp’s San Francisco Mine in Sonora, Mexico. Leak detection testing procedures…

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT

Hollister Waste Rock Facility

Hollister Waste Rock Facility Storage Tierra Group performed a third-party peer review of a Waste Rock Storage Facility (WRSF) design at Klondex Mines’ (Klondex) Hollister Mine in northern Nevada. The WRSF, as designed, involved lining the mine’s existing West Pit…

VIEW PROJECT

El Mochito Mine

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided…

VIEW PROJECT

San Albino Dry Stack Tailings Storage Facility Design

Tierra Group supported construction of the San Albino Mine in Nueva Segovia, Nicaragua. Tierra Group designed a dry stack drum filtered-tailings storage facility. A siting study optimized the dry stack location and minimized CAPEX and OPEX. Tierra Group developed a site-wide water…

VIEW PROJECT