La Libertad Mine

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage 6 and 7 dam crest raise designs incorporated mechanically stabilized earth (MSE) methods to maintain the facility within property boundaries, and reduce construction costs. Tierra Group also developed the detailed closure design for the Esperanza TSF. 

Tierra Group serves as the Engineer of Record (EoR) for the Esperanza TSF. As the EoR, Tierra Group conducted TSF dam breach and downstream inundation analyses, developed detailed TSF water balance, reviewed monthly monitoring data, conducted annual TSF inspections, and prepared an annual monitoring report to document TSF performance and dam safety.

Crimea In-Pit Tailings Storage Facility (TSF)

Tierra Group developed the Crimea In-Pit TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the Crimea In-Pit TSF.

La Esperanza Tailings Storage Facility (TSF)

Tierra Group updated the La Esperanza TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the La Esperanza TSF.

Crimea In-Pit Tailings Storage Facility (TSF) Phase 2 Geotechnical Investigation

Tierra Group completed a geotechnical field investigation to support the Crimea TSF Phase 2 design. Field investigation included exploratory borings, trenches, and laboratory testing on dam foundation materials and proposed borrow sources.

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Similar projects

Hayden Operations

Tierra Group implemented a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview operations staff,…

VIEW PROJECT

Big Ledge Mine

Tierra Group developed a water balance model to track flows into a backfilled pit at the closed Big Ledge Mine Barite Operation near Wells, Nevada. The Model was used to determine pipeline sizing to a remote treatment pond that is…

VIEW PROJECT

El Limón Mine

Tailings Storage Facility & Engineer of Record (2012-present) Tierra Group engineers provided engineering consultancy, design, and construction services for three Tailings Storage Facilities (TSF) (Santa Rosa, Santa Rosa West, and San José) to facilitate 20 years of uninterrupted mine operations. Tierra…

VIEW PROJECT

Brushy Creek 2

Tierra Group was commissioned by Doe Run to design a new tailings storage facility at the Brushy Creek Mine. Tierra Group completed a geotechnical investigation including boring, classifying, and sampling soil and rock. Trade-off studies were performed to minimize construction…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

San Albino Dry Stack Tailings Storage Facility Design

Tierra Group supported construction of the San Albino Mine in Nueva Segovia, Nicaragua. Tierra Group designed a dry stack drum filtered-tailings storage facility. A siting study optimized the dry stack location and minimized CAPEX and OPEX. Tierra Group developed a site-wide water…

VIEW PROJECT

Hod Mine Waste Dump and Surface Water Management Design

Tierra Group provided design review and technical direction at Hod Mine in the Artvin Province of Turkey. Work included detailed design of potentially acid generating and non-acid generating waste dump facilities, their appurtenant structures and stormwater management design for the…

VIEW PROJECT

Los Filos Mine

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Equity Silver ITRB

Tierra Group's Matt Fuller, LEG, P.Geo. serves as one of three ITRB technical experts providing technical assurance of the Engineer of Record’s design and monitoring compliance with BC regulations, the Newmont Corporate Tailings Standard, and industry best practices.

VIEW PROJECT

Tajo Crimea Project

Tierra Group evaluated the Tajo Crimea Pit’s geotechnical and hydrogeological characteristics to determine in-pit tailings storage feasibility. The project scope defined geotechnical and hydrogeologic site conditions through field investigations and in-situ pump testing. Tierra Group developed a 3D groundwater model…

VIEW PROJECT

Marlin Mine

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…

VIEW PROJECT

Santa Pancha Mine

Tierra Group provided a desktop and field review of B2Gold’s Santa Pancha Mine hydrogeology. The review identified data gaps in site data and provided recommendations for improve an existing site hydrogeology model and improve underground water management. The hydrogeologic model…