Midas Mine

Project Highlights:

  • Tailings Management Plan
  • Facility Water Balance
  • Tailings Facility Siting Analysis

The Midas Mine is located in northern Nevada, and is owned and operated by Hecla Mining Company.  The mine is an underground mine with an operating mill. The mine’s existing tailings facilities are nearing their end of operating life and the mine was investigating ways to maximize storage within each facility. Tierra Group assisted Hecla by preparing several evaluations to aid in the mine’s tailings storage operations. Tierra Group’s evaluation included preparation of a tailings management plan and a facility water balance. These evaluations provided the mine with information to manage their tailings deposition and supernatant water pools while also maximizing the facility’s storage capacity. Additionally, Tierra Group prepared a siting study to determine the preferred location of a future tailings storage facility. The siting study included preparing the feasibility level facility design at multiple sites and preparing a design report with Tierra Group’s recommendations.

Project Highlights:

  • Tailings Management Plan
  • Facility Water Balance
  • Tailings Facility Siting Analysis

Similar projects

Equity Silver ITRB

Tierra Group's Matt Fuller, LEG, P.Geo. serves as one of three ITRB technical experts providing technical assurance of the Engineer of Record’s design and monitoring compliance with BC regulations, the Newmont Corporate Tailings Standard, and industry best practices.

VIEW PROJECT

Los Gatos Project

TSF Design and CQA Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico. Tierra Group then…

VIEW PROJECT

Sterling Mine

Sterling Mine is an underground gold mine in southern Nevada which recovers gold through heap leaching and a carbon adsorption-desorption-recovery (ADR) plant. Tierra Group team members have a long history at Sterling, starting with heap leach pad final permanent closure…

VIEW PROJECT

North Mara Mine | Tailings Assurance Audit

Tierra Group completed a TAA for the North Mara Tailings Storage Facility (TSF). The TAA was completed to ensure the TSF and site operations complied with Barrick’s Tailings Management Standard, which closely mirrors the Global Industry Standard on Tailings Management (GISTM)…

VIEW PROJECT

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT

El Gallo Mine

El Gallo is a 3,000 tpd open-pit gold/silver mine located in the foothills of the Sierra Madre Mountain Range in Mexico’s Sinaloa State. Gold is recovered through heap leaching and adsorption/desorption/recovery (ADR). Production commenced at El Gallo with the first gold pour in September…

VIEW PROJECT

Los Lirios Project

Los Lirios is a brownfields mine development project in southern Honduras. Los Lirios lies adjacent to an extensive shrimp-farming industry which raises water quality and supply awareness. Tierra Group is implementing a pre-development baseline water characterization study for the proposed…

VIEW PROJECT

American Gypsum

American Gypsum Pit Planning and Support Tierra Group began working at American Gypsum’s Eagle-Gypsum mine located in Gypsum, Colorado in 2014 evaluating haul road improvements. A trade-off study provided a tool for American Gypsum to evaluate safety improvements including alternative haul road…

VIEW PROJECT

Empire State Mine

Dam Breach Analyses Tierra Group prepared a DBA to evaluate potential downstream impacts due to a hypothetical failure (breach) in three components of Empire State Mines (ESM) tailings storage facility (TSF): North Dam (ND), South Dam (SD), and West Perimeter…

VIEW PROJECT

Bunker Hill | Tailings Storage Facility (TSF) Design

Tierra Group designed the Bunker Hill dry stack TSF. The TSF design was challenging given the limited land area, steep terrain, seasonal cold weather, and surface water management. Tierra Group’s scope of work included siting the facilities, geotechnical investigations, civil…

VIEW PROJECT

NioCorp’s Elk Creek | Tailings Storage Facility (TSF) Feasibility Study

Tierra Group advanced the TSF design to a Feasibility Level according to the Canadian National Instrument NI 43-101 and the U.S. Security and Exchange Commission’s Subpart SK-1300 regulation. Tierra Group’s scope of work included a geotechnical investigation, engineering analysis, and TSF…

VIEW PROJECT

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…