La Libertad Mine

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage 6 and 7 dam crest raise designs incorporated mechanically stabilized earth (MSE) methods to maintain the facility within property boundaries, and reduce construction costs. Tierra Group also developed the detailed closure design for the Esperanza TSF. 

Tierra Group serves as the Engineer of Record (EoR) for the Esperanza TSF. As the EoR, Tierra Group conducted TSF dam breach and downstream inundation analyses, developed detailed TSF water balance, reviewed monthly monitoring data, conducted annual TSF inspections, and prepared an annual monitoring report to document TSF performance and dam safety.

Crimea In-Pit Tailings Storage Facility (TSF)

Tierra Group developed the Crimea In-Pit TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the Crimea In-Pit TSF.

La Esperanza Tailings Storage Facility (TSF)

Tierra Group updated the La Esperanza TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the La Esperanza TSF.

Crimea In-Pit Tailings Storage Facility (TSF) Phase 2 Geotechnical Investigation

Tierra Group completed a geotechnical field investigation to support the Crimea TSF Phase 2 design. Field investigation included exploratory borings, trenches, and laboratory testing on dam foundation materials and proposed borrow sources.

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Similar projects

Jaguar Mines

Jaguar's gold operations, Turmalina, Paciência and Caeté, are located in the Iron Quadrangle region, a prolific greenstone belt near the city of Belo Horizonte in the state of Minas Gerais, Brazil. Jaguar controls 27,357 hectares of mineral concessions in this…

VIEW PROJECT

Cosmo Howley

Newmarket Gold’s Cosmo Howley Project Area (CHPA) is a gold mine in the Northern Territory (NT), Australia. An underground mine is currently in operation with planned underground expansion. CHPA contains several legacy open pits, waste rock dumps, and surface water…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…

VIEW PROJECT

Los Gatos Project

TSF Design and CQA Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico. Tierra Group then…

VIEW PROJECT

Newcrest Cadia Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Palmarejo Mine

Tierra Group performed an initial site visit to Coeur Mining’s Palmarejo Mine to conduct dam safety inspections of the tailings storage facility, environmental control dam, water diversion dam, and water diversion channel. Prior to the site visit, Tierra Group reviewed…

VIEW PROJECT

El Mochito Mine

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided…

VIEW PROJECT

Guanacevi

Tierra Group provided Tailings Stewardship Services, including a dam inspection, slope stability review and operational improvements. The Guanacevi tailings storage facility, located in Durango, Mexico, consists of dry-stack (Press filtered) tailings placed atop a conventional (slurry) tailings storage facility.

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

Camino Rojo Heap Leach Design

Tierra Group provided a heap leach facility detailed design (for construction), procurement, CQA and project management for the Camino Rojo Mine in Zacatecas, Mexico.

VIEW PROJECT

Rosario Mine

Tierra Group performed a Dam Safety Review (DSR) including geotechnical investigations and seepage and slope stability analyses for a 20-m high TSF at this 300‑tpd underground polymetallic mine. The audit was prepared following the Mt. Polley tailings dam failure in…

VIEW PROJECT

Pierina Mine

Barrick Gold Corporation’s Pierina Mine in Ancash Department, Perú began operations in 1998. A progressive reclamation and closure plan began in 2013.  In 2015-16 Tierra Group developed detailed engineering designs for channels, sediment traps, two 45,000 m3 sediment ponds, water…

VIEW PROJECT