New Jersey Mill TSF

Project Highlights:

  • Geotechnical Investigation
  • TSF Raise Design
  • Civil Design
  • Hydrology/Hydraulics
  • Liquefaction
  • Permitting Support
  • Tailings Storage Facility
  • Siting Study

Tierra Group completed a siting study to evaluate six potential sites for a paste TSF. Tierra Group prepared civil layouts for each TSF, determining embankment fill volumes, evaluating required diversions for upstream catchment areas, and pipeline corridor layouts.

Tierra Group completed the design for two 3-m upstream raises to an existing paste TSF. The project included a test pit investigation, cone penetration testing, embankment raise and upgradient diversion channel civil design, slope stability analyses, and hydrologic and hydraulic analyses to determine peak flows and the size of stormwater channels and a spillway. Tierra Group prepared an Engineering Design Report, including Issued for Construction (IFC) drawings and technical specifications package to satisfy the Idaho Mine Tailings Impoundment Structures Rules (IDAPA 37.03.05) requirements for proposed TSF raises. Tierra Group also provided permitting support, including preparing a TSF tentative closure plan and a preliminary closure bond estimate.

Project Highlights:

  • Geotechnical Investigation
  • TSF Raise Design
  • Civil Design
  • Hydrology/Hydraulics
  • Liquefaction
  • Permitting Support
  • Tailings Storage Facility
  • Siting Study

Similar projects

Pitarrilla Mine

Tierra Group participated as a member of a multi-disciplinary project team to develop a Definitive Feasibility study for a 16,000 tpd silver mine in Durango, Mexico. Tierra Group's responsibilities included designing a 112 Mt tailings storage facility, developing a site-wide…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…

VIEW PROJECT

Marlin Mine

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…

VIEW PROJECT

Douglas County, CO | 2020 Stormwater Support

Tierra Group provided engineering and permitting support to Douglas County Public Works Engineering for NPDES Phase II Program compliance. Tierra Group’s scope of work included developing Runoff Control Plans (RCPs) for new County facilities, updating RCPs at existing County facilities,…

VIEW PROJECT

La Caridad | Tailings Storage Facility Audit

Tierra Group performed the La Caridad TSF Audit. Tierra Group’s scope of work entailed a site visit, data review, dam safety inspection (DSI), site interviews, and provided best management practices training for operations personnel.

VIEW PROJECT

Isabella Pearl

Tierra Group performed a technical peer review of the Isabella Pearl heap leach facility (HLF) owned by Gold Resource Corporation. Isabella Pearl mine is located at the west end of the Santa Fe mining district in the Walker Lane gold…

VIEW PROJECT

Buriticá Tailings Stewardship & Cyanide Speciation

Tierra Group provided Tailings Stewardship Services for Continental Gold’s Buriticá Project in Antioquia, Columbia which included permitting support, Third-Party Review and construction and operations support. Tierra Group oversaw the development of a 2D hydrodynamic model to support the design of…

VIEW PROJECT

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…

VIEW PROJECT

Missouri Cobalt Pilot Plant HAZOP

Tierra Group performed a Hazard and Operability review (HAZOP) for the new Cobalt Pilot Pant located at the Madison Mine facility in Missouri.

VIEW PROJECT

Newcrest Red Chris Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

El Limón Mine

Tailings Storage Facility & Engineer of Record (2012-present) Tierra Group engineers provided engineering consultancy, design, and construction services for three Tailings Storage Facilities (TSF) (Santa Rosa, Santa Rosa West, and San José) to facilitate 20 years of uninterrupted mine operations. Tierra…

VIEW PROJECT

Pierina Mine

Barrick Gold Corporation’s Pierina Mine in Ancash Department, Perú began operations in 1998. A progressive reclamation and closure plan began in 2013.  In 2015-16 Tierra Group developed detailed engineering designs for channels, sediment traps, two 45,000 m3 sediment ponds, water…

VIEW PROJECT