New Jersey Mill TSF

Project Highlights:

  • Geotechnical Investigation
  • TSF Raise Design
  • Civil Design
  • Hydrology/Hydraulics
  • Liquefaction
  • Permitting Support
  • Tailings Storage Facility
  • Siting Study

Tierra Group completed a siting study to evaluate six potential sites for a paste TSF. Tierra Group prepared civil layouts for each TSF, determining embankment fill volumes, evaluating required diversions for upstream catchment areas, and pipeline corridor layouts.

Tierra Group completed the design for two 3-m upstream raises to an existing paste TSF. The project included a test pit investigation, cone penetration testing, embankment raise and upgradient diversion channel civil design, slope stability analyses, and hydrologic and hydraulic analyses to determine peak flows and the size of stormwater channels and a spillway. Tierra Group prepared an Engineering Design Report, including Issued for Construction (IFC) drawings and technical specifications package to satisfy the Idaho Mine Tailings Impoundment Structures Rules (IDAPA 37.03.05) requirements for proposed TSF raises. Tierra Group also provided permitting support, including preparing a TSF tentative closure plan and a preliminary closure bond estimate.

Project Highlights:

  • Geotechnical Investigation
  • TSF Raise Design
  • Civil Design
  • Hydrology/Hydraulics
  • Liquefaction
  • Permitting Support
  • Tailings Storage Facility
  • Siting Study

Similar projects

Antapaccay

Glencore’s Antapaccay mine is located in the Espinar province, Cuzco, Perú. Tierra Group logged geotechnical, geological and geo-mechanical properties of drill core advanced in Antapaccay's Northern Pit. Approximately 6,000 meters of core were logged. Specific samples were selected for geotechnical…

VIEW PROJECT

Marlin Mine

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…

VIEW PROJECT

Santa Pancha Mine

Tierra Group provided a desktop and field review of B2Gold’s Santa Pancha Mine hydrogeology. The review identified data gaps in site data and provided recommendations for improve an existing site hydrogeology model and improve underground water management. The hydrogeologic model…

VIEW PROJECT

El Limón Mine

Tailings Storage Facility & Engineer of Record (2012-present) Tierra Group engineers provided engineering consultancy, design, and construction services for three Tailings Storage Facilities (TSF) (Santa Rosa, Santa Rosa West, and San José) to facilitate 20 years of uninterrupted mine operations. Tierra…

VIEW PROJECT

Douglas County, CO | 2020 Stormwater Support

Tierra Group provided engineering and permitting support to Douglas County Public Works Engineering for NPDES Phase II Program compliance. Tierra Group’s scope of work included developing Runoff Control Plans (RCPs) for new County facilities, updating RCPs at existing County facilities,…

VIEW PROJECT

Newcrest Cadia Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Tennessee Mines

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to…

VIEW PROJECT

Aurora Mine

The Aurora Mine Mill Facility (previously Esmeralda Mill) is located in the historic Aurora mining district of the eastern Sierra Nevada Mountain Range in Nevada, USA. Aurora recently, with the support of Tierra Group completed a Minor Modification to the…

VIEW PROJECT

American Gypsum

American Gypsum Pit Planning and Support Tierra Group began working at American Gypsum’s Eagle-Gypsum mine located in Gypsum, Colorado in 2014 evaluating haul road improvements. A trade-off study provided a tool for American Gypsum to evaluate safety improvements including alternative haul road…

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

North Mara Mine | Tailings Assurance Audit

Tierra Group completed a TAA for the North Mara Tailings Storage Facility (TSF). The TAA was completed to ensure the TSF and site operations complied with Barrick’s Tailings Management Standard, which closely mirrors the Global Industry Standard on Tailings Management (GISTM)…

VIEW PROJECT

Condor Gold | La India TSF Feasibility Design

Tierra Group provided a feasibility-level Tailings Storage Facility (TSF) design for Condor Gold’s La India Project permitting, a planned 2,000 tpd open pit mine in western Nicaragua. TSF embankments used rockfill from the open pit and a geomembrane liner for…

VIEW PROJECT