La Libertad Mine

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage 6 and 7 dam crest raise designs incorporated mechanically stabilized earth (MSE) methods to maintain the facility within property boundaries, and reduce construction costs. Tierra Group also developed the detailed closure design for the Esperanza TSF. 

Tierra Group serves as the Engineer of Record (EoR) for the Esperanza TSF. As the EoR, Tierra Group conducted TSF dam breach and downstream inundation analyses, developed detailed TSF water balance, reviewed monthly monitoring data, conducted annual TSF inspections, and prepared an annual monitoring report to document TSF performance and dam safety.

Crimea In-Pit Tailings Storage Facility (TSF)

Tierra Group developed the Crimea In-Pit TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the Crimea In-Pit TSF.

La Esperanza Tailings Storage Facility (TSF)

Tierra Group updated the La Esperanza TSF Operations, Maintenance, and Surveillance (OMS) Manual and Emergency Action Plan (EAP). for the La Esperanza TSF.

Crimea In-Pit Tailings Storage Facility (TSF) Phase 2 Geotechnical Investigation

Tierra Group completed a geotechnical field investigation to support the Crimea TSF Phase 2 design. Field investigation included exploratory borings, trenches, and laboratory testing on dam foundation materials and proposed borrow sources.

Project Highlights:

  • Geologic Hazard Assessment
  • Detailed Design for Construction
  • Earthfill Conventional TSF
  • Environmental Permitting
  • Feasibility Design
  • CQA
  • As-Built Drawings and Report
  • Operations Plans
  • Dam Monitoring
  • Tailings Storage Facility
  • Geotechnical Investigation
  • In-Pit Tailings Disposal
  • Operations, Maintenance, and Surveillance Manual

Similar projects

Terronera Project

Hydrogeologic Characterization Tierra Group provided hydrogeological support for data characterization and developed a conceptual and groundwater model to evaluate mine water inflows and the associated groundwater drawdown due to mine dewatering activities. Water Management Technical Review Tierra Group provided a…

VIEW PROJECT

El Limón Mine

Tailings Storage Facility & Engineer of Record (2012-present) Tierra Group engineers provided engineering consultancy, design, and construction services for three Tailings Storage Facilities (TSF) (Santa Rosa, Santa Rosa West, and San José) to facilitate 20 years of uninterrupted mine operations. Tierra…

VIEW PROJECT

San Francisco Mine

Tierra Group conducted geo-electrical testing to locate leaks present in the geomembrane liners underlying a Solution Conveyance Canal, Sumps 1 and 2, and the Intermediate Pond at Timmins Gold Corp’s San Francisco Mine in Sonora, Mexico. Leak detection testing procedures…

VIEW PROJECT

Sweetwater Mine

Sweetwater Mine Permitting Tierra Group’s Team began work at the Sweetwater mine in 1993 assisting permitting and developing tailings impoundment management strategies for the mine. We successfully designed and installed an innovative internal seal for repair of the mine’s damaged…

VIEW PROJECT

Pierina Mine

Barrick Gold Corporation’s Pierina Mine in Ancash Department, Perú began operations in 1998. A progressive reclamation and closure plan began in 2013.  In 2015-16 Tierra Group developed detailed engineering designs for channels, sediment traps, two 45,000 m3 sediment ponds, water…

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT

Big Ledge Mine

Tierra Group developed a water balance model to track flows into a backfilled pit at the closed Big Ledge Mine Barite Operation near Wells, Nevada. The Model was used to determine pipeline sizing to a remote treatment pond that is…

VIEW PROJECT

Orotex Mine Project

Tierra Group provided tailings engineering design and consulting services for the redevelopment of the Orotex underground mine in Alajuela, Costa Rica. Tierra Group's areas of responsibility included tailings and water management in this environmentally sensitive, high rainfall, tropical, mountainous region.

VIEW PROJECT

Topia Mine

Topia Mine Phases 1-3Tierra Group supervised the first 3 phases of Geologic Mapping and Instrumentation Installation and developed a Mechanically Stabilized Earth Wall Design at Great Panther Silver’s Topia Mine in Durango, Mexico.

VIEW PROJECT

Sterling Mine

Sterling Mine is an underground gold mine in southern Nevada which recovers gold through heap leaching and a carbon adsorption-desorption-recovery (ADR) plant. Tierra Group team members have a long history at Sterling, starting with heap leach pad final permanent closure…

VIEW PROJECT

Anglo American Quellaveco Mine | Perú

Tierra Group supervised a geotechnical and hydrogeologic drilling investigation program at Anglo American’s Quellaveco Mine in the Moquegua Region of Peru. Geotechnical Investigation Tierra Group developed a geotechnical and hydrogeological research plan within and near the Quellaveco Pit footprint. This…

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT