El Mochito Mine

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided engineering consultancy, design, and construction services for three tailings storage facilities (El Bosque, Pozo Azul, and Soledad) to maintain continuous mining operations. Being located in the tropics, tailings management at El Mochito has been fraught with many challenges including; monsoons, floods, karstik terrain, debris flows, constructing with tropical soils (laterite and saprolite), and social unrest. During the full mine life-cycle of three tailings storage facilities, Tierra Group has persevered with the owners and mine management to maintain continual operations with zero lost-time accidents.

Since 2012, Tierra Group has provided EoR support for the Bosque, Pozo Azul, and Soledad TSFs. Tierra Group engineers provided engineering consultancy, design, and construction services to maintain continuous mining operations for three cyclone sand tailings dams (El Bosque, Pozo Azul, and Soledad). Additional EoR support included performance monitoring data acquisition and review, site-specific dam safety inspections, operations, and performance monitoring assessments.

Tailings management at El Mochito has been fraught with challenges: monsoons, floods, karstic terrain, debris flows, construction in tropical soils (laterite and saprolite), and social unrest. Nevertheless, during the entire mine life-cycle of three TSFs, Tierra Group has persevered with the owners and mine management to maintain operations with zero lost-time accidents.

In 2021,Tierra Group provided engineering services for the Soledad TSF Stage 5 raise, including impoundment grading, conventional impoundment lining (with geomembrane), and steep slope impoundment linings (with geomembrane and additional geosynthetic reinforcement).

Tierra Group remains the Engineer of Record for El Mochito, with 2022 and 2023 accomplishments encompassing the Soledad TSF dam raise, involving stability analysis and civil design for an upstream raise to reach an 810-meter crest elevation. Furthermore, Tierra Group sustained its support for monitoring the closure of El Bosque and Pozo Azul TSFs.

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

Similar projects

Santa Pancha Mine

Tierra Group provided a desktop and field review of B2Gold’s Santa Pancha Mine hydrogeology. The review identified data gaps in site data and provided recommendations for improve an existing site hydrogeology model and improve underground water management. The hydrogeologic model…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

Amulsar Gold Project

Tierra Group completed a technical review of the heap leach pad for the Amulsar Mine property owned by Lydian Armenia located near the town of Jermuk to the southeast of Armenia. The heap leach pad consists of four phases with…

VIEW PROJECT

Dam Assessment

Tierra Group performed a site visit and visual inspection of a dam to assess its overall condition and provide the Owner recommendations for continued maintenance, monitoring, and improvements. The assessment was a follow-up to previous work completed by Tierra Group…

VIEW PROJECT

Tajo Crimea Project

Tierra Group evaluated the Tajo Crimea Pit’s geotechnical and hydrogeological characteristics to determine in-pit tailings storage feasibility. The project scope defined geotechnical and hydrogeologic site conditions through field investigations and in-situ pump testing. Tierra Group developed a 3D groundwater model…

VIEW PROJECT

Bunker Hill

Dry Stack Tailings Storage Facility Tierra Group designed a dry stack TSF to store excess tailings from the underground paste backfill. The dry stack TSF was challenging, given the limited land area, steep terrain, seasonal cold weather, and surface water…

VIEW PROJECT

El Mochito Mine

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided…

VIEW PROJECT

El Limón Mine

Tailings Storage Facility & Engineer of Record (2012-present) Tierra Group engineers provided engineering consultancy, design, and construction services for three Tailings Storage Facilities (TSF) (Santa Rosa, Santa Rosa West, and San José) to facilitate 20 years of uninterrupted mine operations. Tierra…

VIEW PROJECT

Buriticá Tailings Stewardship & Cyanide Speciation

Tierra Group provided Tailings Stewardship Services for Continental Gold’s Buriticá Project in Antioquia, Columbia which included permitting support, Third-Party Review and construction and operations support. Tierra Group oversaw the development of a 2D hydrodynamic model to support the design of…

VIEW PROJECT

Topia Mine

Topia Mine Phases 1-3Tierra Group supervised the first 3 phases of Geologic Mapping and Instrumentation Installation and developed a Mechanically Stabilized Earth Wall Design at Great Panther Silver’s Topia Mine in Durango, Mexico.

VIEW PROJECT

La Libertad Mine

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage…

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT