Mina Anaconda

Project Highlights:

  • Estudio de compensaciĆ³n

Tierra Group completó estudios de compensación evaluando posibles sitios de TSF para almacenar 25 millones de toneladas de relaves. Los estudios de compensación incluyeron diseños de presas, estimación de costos y recomendaciones para trabajos futuros. Los desafíos del estudio de compensación incluyeron minimizar los costos y al mismo tiempo proporcionar alternativas viables y ambientalmente sensibles.

Project Highlights:

  • Estudio de compensaciĆ³n

Similar projects

Mexican Hat PEA Update

Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT

Hod Mine Waste Dump and Surface Water Management Design

Tierra Group provided design review and technical direction at Hod Mine in the Artvin Province of Turkey. Work included detailed design of potentially acid generating and non-acid generating waste dump facilities, their appurtenant structures and stormwater management design for the…

VIEW PROJECT

Bolivar Mine

The Bolivar mine is a 3,000 tonne per day underground mining operation in Chihuahua, Mexico producing copper, zinc, silver, and gold. Space constraints in mountainous terrain require dewatering tailings to reduce required area for tailings storage. Tierra Group is assisting…

VIEW PROJECT

North Mara Mine | Tailings Assurance Audit

Tierra Group completed a TAA for the North Mara Tailings Storage Facility (TSF). The TAA was completed to ensure the TSF and site operations complied with Barrick’s Tailings Management Standard, which closely mirrors the Global Industry Standard on Tailings Management (GISTM)…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

Fekola Project | Mali

Earthworks & Construction Quality Control (CQC) Services Tierra Group provided earthworks and concrete Construction Quality Control (CQC) services for B2Gold's Fekola Mine in western Mali. Tierra Group overcame the remote location and kept a dedicated team on-site throughout the 2-year…

VIEW PROJECT