Oracle Ridge Copper

Project Highlights:

  • Tailings Storage Facility Design
  • Stormwater Management
  • Water Supply
  • Closure

Tierra Group represented Oracle Ridge Mining as the Qualified Person for portions of the feasibility-level design including the Dry Stack Tailings Storage Facility (TSF) Design, Site-Wide Stormwater Management, Water Supply Pipelines, Haul Road and Access Road Design Improvements, and the Mine Closure Plan. Project included a feasibility-level Dry Stack TSF design including the design basis, description of TSF components, engineering design, stacking plan, construction quantity estimate, and drawings. All components of the design complied with Arizona Department of Environmental Quality (ADEQ) best available demonstrated control technology (BADCT) requirements.

Project Highlights:

  • Tailings Storage Facility Design
  • Stormwater Management
  • Water Supply
  • Closure

Similar projects

Goldfield Bonanza Project

Lode-Star Gold, Inc., in advance of their proposed mining operations, submited a Physical Separation Facility application with the State of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine, located in the historic high-grade gold-bearing district of…

VIEW PROJECT

Bolivar Mine

The Bolivar mine is a 3,000 tonne per day underground mining operation in Chihuahua, Mexico producing copper, zinc, silver, and gold. Space constraints in mountainous terrain require dewatering tailings to reduce required area for tailings storage. Tierra Group is assisting…

VIEW PROJECT

San Albino

Dry Stack Tailings Storage Facility Design Tierra Group supported construction of the San Albino Mine in Nueva Segovia, Nicaragua. Tierra Group designed a dry stack drum filtered-tailings storage facility. A siting study optimized the dry stack location and minimized CAPEX and OPEX.…

VIEW PROJECT

Ernesto e Pau-a-Pique

The Ernesto e Pau-a-Pique (EPP) Mine is located in the Municipality of Pontes e Lacerda, at 440 kms west of Cuiba City, Brazil. The mine is operated by Apoena Mining, a subsidiary of Aura Minerals Inc. Tierra Group was retained…

VIEW PROJECT

Cerro Negro

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Tennessee Mines

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to…

VIEW PROJECT

American Gypsum

American Gypsum Pit Planning and Support Tierra Group began working at American Gypsum’s Eagle-Gypsum mine located in Gypsum, Colorado in 2014 evaluating haul road improvements. A trade-off study provided a tool for American Gypsum to evaluate safety improvements including alternative haul road…

VIEW PROJECT

Anglo American Quellaveco Mine | PerĂº

Tierra Group supervised a geotechnical and hydrogeologic drilling investigation program at Anglo American’s Quellaveco Mine in the Moquegua Region of Peru. Geotechnical Investigation Tierra Group developed a geotechnical and hydrogeological research plan within and near the Quellaveco Pit footprint. This…

VIEW PROJECT

Santa Pancha Mine

Tierra Group provided a desktop and field review of B2Gold’s Santa Pancha Mine hydrogeology. The review identified data gaps in site data and provided recommendations for improve an existing site hydrogeology model and improve underground water management. The hydrogeologic model…

VIEW PROJECT

Bolanitos

Tierra Group provided Tailings Stewardship Services including a dam inspection, slope stability analysis review and operational improvements for Endeavour Silver’s Bolanitos tailings storage facility.

VIEW PROJECT

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.