Caeté Complex

Project Highlights:

  • Water Management
  • Water Balance
  • Water Treatment
  • Tailings Storage Evaluation

Tierra Group developed a site-wide water management plan, and performed a liquefaction potential study following the Samarco tailings dam failure in Minas Gerais, Brazil. A tailings storage facility water balance was developed to optimize water usage and minimize risks at the site. Several water management strategies were recommended including enhanced evaporation methods, water reuse and treatment to manage potential process water shortages. A tailings liquefaction potential study assisted Jaguar in their tailings handling activities which includes "farming" pre-deposited tailings to increase tailings storage capacities at several of their tailings storage facilities.

Project Highlights:

  • Water Management
  • Water Balance
  • Water Treatment
  • Tailings Storage Evaluation

Similar projects

Tajo Crimea Project

Tierra Group evaluated the Tajo Crimea Pit’s geotechnical and hydrogeological characteristics to determine in-pit tailings storage feasibility. The project scope defined geotechnical and hydrogeologic site conditions through field investigations and in-situ pump testing. Tierra Group developed a 3D groundwater model…

VIEW PROJECT

Fire Creek Mine

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As…

VIEW PROJECT

Karouni Mine

Tierra Group reviewed and provided pit slope recommendations and conducted hydrological assessments for the Resource 1 and 2 deposits water management system at Troy Resources’ Karouni Mine (Karouni). Advanced pre-feasibility level recommendations for pit development were provided based on benchmarking…

VIEW PROJECT

Jaguar Mines

Jaguar's gold operations, Turmalina, Paciência and Caeté, are located in the Iron Quadrangle region, a prolific greenstone belt near the city of Belo Horizonte in the state of Minas Gerais, Brazil. Jaguar controls 27,357 hectares of mineral concessions in this…

VIEW PROJECT

Equity Silver ITRB

Tierra Group's Matt Fuller, LEG, P.Geo. serves as one of three ITRB technical experts providing technical assurance of the Engineer of Record’s design and monitoring compliance with BC regulations, the Newmont Corporate Tailings Standard, and industry best practices.

VIEW PROJECT

Rosario Mine

Tierra Group performed a Dam Safety Review (DSR) including geotechnical investigations and seepage and slope stability analyses for a 20-m high TSF at this 300‑tpd underground polymetallic mine. The audit was prepared following the Mt. Polley tailings dam failure in…

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT

Fekola Project | Mali

Earthworks & Construction Quality Control (CQC) Services Tierra Group provided earthworks and concrete Construction Quality Control (CQC) services for B2Gold's Fekola Mine in western Mali. Tierra Group overcame the remote location and kept a dedicated team on-site throughout the 2-year…

VIEW PROJECT

Orotex Mine Project

Tierra Group provided tailings engineering design and consulting services for the redevelopment of the Orotex underground mine in Alajuela, Costa Rica. Tierra Group's areas of responsibility included tailings and water management in this environmentally sensitive, high rainfall, tropical, mountainous region.

VIEW PROJECT

American Gypsum

American Gypsum Pit Planning and Support Tierra Group began working at American Gypsum’s Eagle-Gypsum mine located in Gypsum, Colorado in 2014 evaluating haul road improvements. A trade-off study provided a tool for American Gypsum to evaluate safety improvements including alternative haul road…

VIEW PROJECT

Hermosa Project

Tierra Group provided a Third-Party review of the Hermosa Project Tailings Storage Facility Design and Construction stages 1 & 2 in Patagonia, Arizona

VIEW PROJECT

Lost Creek Project | USA

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT