El Mochito Mine

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided engineering consultancy, design, and construction services for three tailings storage facilities (El Bosque, Pozo Azul, and Soledad) to maintain continuous mining operations. Being located in the tropics, tailings management at El Mochito has been fraught with many challenges including; monsoons, floods, karstik terrain, debris flows, constructing with tropical soils (laterite and saprolite), and social unrest. During the full mine life-cycle of three tailings storage facilities, Tierra Group has persevered with the owners and mine management to maintain continual operations with zero lost-time accidents.

Since 2012, Tierra Group has provided EoR support for the Bosque, Pozo Azul, and Soledad TSFs. Tierra Group engineers provided engineering consultancy, design, and construction services to maintain continuous mining operations for three cyclone sand tailings dams (El Bosque, Pozo Azul, and Soledad). Additional EoR support included performance monitoring data acquisition and review, site-specific dam safety inspections, operations, and performance monitoring assessments.

Tailings management at El Mochito has been fraught with challenges: monsoons, floods, karstic terrain, debris flows, construction in tropical soils (laterite and saprolite), and social unrest. Nevertheless, during the entire mine life-cycle of three TSFs, Tierra Group has persevered with the owners and mine management to maintain operations with zero lost-time accidents.

In 2021,Tierra Group provided engineering services for the Soledad TSF Stage 5 raise, including impoundment grading, conventional impoundment lining (with geomembrane), and steep slope impoundment linings (with geomembrane and additional geosynthetic reinforcement).

Tierra Group remains the Engineer of Record for El Mochito, with 2022 and 2023 accomplishments encompassing the Soledad TSF dam raise, involving stability analysis and civil design for an upstream raise to reach an 810-meter crest elevation. Furthermore, Tierra Group sustained its support for monitoring the closure of El Bosque and Pozo Azul TSFs.

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

Similar projects

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

San Albino Dry Stack Tailings Storage Facility Design

Tierra Group supported construction of the San Albino Mine in Nueva Segovia, Nicaragua. Tierra Group designed a dry stack drum filtered-tailings storage facility. A siting study optimized the dry stack location and minimized CAPEX and OPEX. Tierra Group developed a site-wide water…

VIEW PROJECT

Çöpler Tailings Storage Facility and Heap Leach Facility Technical Review

Tierra Group has a history of annually providing third-party technical reviews for the tailings storage facility and heap leach facility at Anagold's Çöpler Gold Mine in Middle Anatolia, Turkey. Additionally, Tierra Group currently performs independent technical reviews for the rockfill…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT

El Diamante Hydropower Dam

Tierra Group conducted a Preliminary Site Assessment of a potential large-scale landslide near the El Diamante Hydropower Complex in Matagalpa, Nicaragua.

VIEW PROJECT

Hermosa Project

Tierra Group provided a Third-Party review of the Hermosa Project Tailings Storage Facility Design and Construction stages 1 & 2 in Patagonia, Arizona

VIEW PROJECT

Amulsar Gold Project

Tierra Group completed a technical review of the heap leach pad for the Amulsar Mine property owned by Lydian Armenia located near the town of Jermuk to the southeast of Armenia. The heap leach pad consists of four phases with…

VIEW PROJECT

Big Ledge Mine

Tierra Group developed a water balance model to track flows into a backfilled pit at the closed Big Ledge Mine Barite Operation near Wells, Nevada. The Model was used to determine pipeline sizing to a remote treatment pond that is…

VIEW PROJECT

Rhyolite Ridge

Tierra Group is providing water management and geotechnical engineering services to support a Preliminary Feasibility Study at the Rhyolite Ridge Lithium Mine Project in Nevada.

VIEW PROJECT

Stillwater Mine

Nye-Hertzler Tailings Independent Review Panel (2020-2023) Tierra Group reviewed the TSF design to support an NI 43-101 compliant Feasibility Study. The TSF design incorporated a paste tailings disposal method in an environmentally sensitive fisheries habitat. Tierra Group sits on the Independent Review…

VIEW PROJECT

Andina Veladero Engineering Review

Tierra Group performed a forensic study to determine the cause for volumetrically non-compliant leakage volumes occurring in the heap leach facilities leak detection system. Tierra Group reviewed the facility design, engineering and construction quality assurance (CQA) information, construction as built…

VIEW PROJECT