Marlin Mine

Project Highlights:

  • Tailings Stewardship Services

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management practices and facilities to assure Best Management Practices (BMP) are implemented and potential risks reduced.

Project Highlights:

  • Tailings Stewardship Services

Similar projects

Guanacevi

Tierra Group provided Tailings Stewardship Services, including a dam inspection, slope stability review and operational improvements. The Guanacevi tailings storage facility, located in Durango, Mexico, consists of dry-stack (Press filtered) tailings placed atop a conventional (slurry) tailings storage facility.

VIEW PROJECT

Pirquitas Tailings Review

Tierra Group prepared a civil engineering design for SSR Mining’s Mina Pirquitas in Jujuy Province, Argentina and developed current and future water-mass balance through hydrological/hydraulics calculations and modeling. Tierra Group developed the ultimate tailings surface, deposition plan, spillway relocation analysis,…

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

Ray Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

Amulsar Gold Project

Tierra Group completed a technical review of the heap leach pad for the Amulsar Mine property owned by Lydian Armenia located near the town of Jermuk to the southeast of Armenia. The heap leach pad consists of four phases with…

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT

Newcrest Telfer Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

Myra Falls

Tierra Group provides Tailings Stewardship Services for Nyrstar's Myra Falls Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, site training and in depth inspections of management practices and facilities…

VIEW PROJECT

Pitarrilla Mine

Tierra Group participated as a member of a multi-disciplinary project team to develop a Definitive Feasibility study for a 16,000 tpd silver mine in Durango, Mexico. Tierra Group's responsibilities included designing a 112 Mt tailings storage facility, developing a site-wide…

VIEW PROJECT

La Trinidad

Tierra Group began work at La Trinidad providing heap leach pad construction recommendations and a water balance. Tierra Group continued support with a heap leach pad expansion design, slope stability analyses, hydrologic analyses, diversion design, liner design, and leach solution…

VIEW PROJECT

Tailings Review & Assurance Audit | Montana

Tailings Management Assurance Review Tierra Group served as the Lead Auditor and conducted MARs for the TSFs at this confidential project. Tierra Group reviewed all available facility documentation, including OMS Manuals, EAPs, design reports, As-Built Reports, annual inspection reports, and other…

VIEW PROJECT