Goldfield Bonanza Project

Project Highlights:

  • Water Management
  • Waste Rock Storage
  • Closure Design
  • Permitting Support

Lode-Star Gold, Inc. in advance of their proposed mining operations is preparing to submit a Physical Separation Facility application with the state of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine is located in the historic, high-grade gold-bearing district of Goldfield, Nevada which, within the period of 1904-1918, produced just under 4 million ounces of gold. As part of the permitting application, Tierra Group International, Inc. is preparing the design of a waste rock storage option within the underground workings and abandoned shafts at the site. Tierra Group has also aided in preparing figures and conceptual drawings required in the permitting process.

Project Highlights:

  • Water Management
  • Waste Rock Storage
  • Closure Design
  • Permitting Support

Similar projects

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed tradeoff studies evaluating potential TSF sites to store 25 million tonnes of tailings. Tradeoff studies included dam layouts, cost estimating, and recommendations for future work. Trade off study challenges were minimizing costs while…

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT

Fekola Project

Tierra Group provided earthworks and concrete Construction Quality Control (CQC) services for B2Gold's Fekola Mine in western Mali. Tierra Group overcame the remote location and kept a dedicated team on-site throughout the 2-year mine development. Tierra Group assisted Fekola Mine…

VIEW PROJECT

Cerro Negro

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Confidential Client - Turkey

Tierra Group International performed a Tailings Storage Facility Third Party Design Review for a confidential client in Turkey.

VIEW PROJECT

Lagunas Norte Mine

The Lagunas Norte mine, operated by Barrick Misquichilca S.A., is an open pit gold mine located in the Quiruvilca district, Santiago de Chuco province, La Libertad department, Perú. The main study objective is to evaluate the volume of effluent discharge…

VIEW PROJECT

Cosmo Howley

Newmarket Gold’s Cosmo Howley Project Area (CHPA) is a gold mine in the Northern Territory (NT), Australia. An underground mine is currently in operation with planned underground expansion. CHPA contains several legacy open pits, waste rock dumps, and surface water…

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

El Gallo Mine

El Gallo is a 3,000 tpd open-pit gold/silver mine located in the foothills of the Sierra Madre Mountain Range in Mexico’s  Sinaloa  state.  Gold  recovery  is  through  heap  leaching  and  adsorption/desorption/recovery  (ADR). Production commencement at El Gallo started with the…

VIEW PROJECT

Guanacevi

Tierra Group provided Tailings Stewardship Services, including a dam inspection, slope stability review and operational improvements. The Guanacevi tailings storage facility, located in Durango, Mexico, consists of dry-stack (Press filtered) tailings placed atop a conventional (slurry) tailings storage facility.

VIEW PROJECT

Esmeralda Mill

Tierra Group was contracted by Waterton Global Mining Company to prepare the FPCP for TSF No.1 at the Esmeralda Mine. TSF No.1 covered approximately 100 acres, included a rockfill embankment with a maximum height approximately 60 feet, and stored gold tailings. Work…

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT