Statement of Qualifications

Civil engineering is designing, constructing, and maintaining physical structures, and comprises at least a partial component of nearly everything Tierra Group International, Ltd. does. Whether applying our core, geotechnical, water resources, or geologic hazards expertise, inevitably our work leads to modifications made to the natural environment or the construction of man-made structures. Tierra Group applies its civil engineering expertise to the conception, design, construction, and operations of physical structures such as:

  • Tailings Dams
  • Water Dams
  • Heap Leach Pads
  • Waste Rock Dumps
  • Retaining Walls
  • Hydraulic Structures - Canals, Channels, Head Structures, Culverts, Pipelines, and Ponds
  •  Infrastructure - Foundations, Roads, Bridge Abutments

Tierra Group has applied our professional civil engineering expertise designing and constructing dozens of these structures on six continents. This geographic variety has allowed Tierra Group’s Team to develop expertise designing facilities under a variety of challenging geotechnical conditions and climates, such as:

  • Laterites
  • Saprolites
  • Swelling or Collapsible Soils
  • Karst
  • High and Active Seismicity (Earthquakes)
  • High Altitudes (4,000 masl)
  • Tropics

Tierra Group has innovatively adapted to these challenging environments using highly-trained professionals and state-of-the-art techniques and software to execute the following:

  • Conceptual Plans
  • Feasibility Designs
  • Final Engineering Designs
  • “For Construction” Drawings
  • Construction Specifications
  • Resident Engineering
  • Quality Assurance

Regardless of the engineering challenges posed, Tierra Group’s broad experience, intimate attention to site-specific conditions, and keen focus on developing innovative solutions has earned us a respected reputation and loyal clients around the world.


Select Civil Projects

Turmalina Complex

Tierra Group developed a site-wide water management plan to improve operational water usage and management at Jaguar Mining's Turmalina Complex in Minas Gerais, Brazil. Turmalina is a zero-discharge facility that required optimizing tailings supernatant usage in the process, enhanced evaporation…

VIEW PROJECT

Çöpler TSF/HLF Technical Review

Tierra Group provided an annual third-party tailings storage facility and heap leach facility technical review at Anagold’s Çöpler Gold Mine in Middle Anatolia, Turkey.

VIEW PROJECT

El Gallo Mine

El Gallo is a 3,000 tpd open-pit gold/silver mine located in the foothills of the Sierra Madre Mountain Range in Mexico’s Sinaloa State. Gold is recovered through heap leaching and adsorption/desorption/recovery (ADR). Production commenced at El Gallo with the first gold pour in September…

VIEW PROJECT

Minera Plata Real | Los Gatos Project

Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico.

VIEW PROJECT

Ray Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

San Andrés Mine

Previous to Tierra Group, our Team performed a geotechnical forensics assessment, which determined that spent ore from an on-off leach pad operation had liquefied causing a debris flow, which threatened inundating a major river basin. A preventative detention buttress was…

VIEW PROJECT

El Diamante Hydropower Dam

Tierra Group conducted a Preliminary Site Assessment of a potential large-scale landslide near the El Diamante Hydropower Complex in Matagalpa, Nicaragua.

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

Mission Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

San Francisco Mine

Tierra Group conducted geo-electrical testing to locate leaks present in the geomembrane liners underlying a Solution Conveyance Canal, Sumps 1 and 2, and the Intermediate Pond at Timmins Gold Corp’s San Francisco Mine in Sonora, Mexico. Leak detection testing procedures…

VIEW PROJECT

Hecla WWR 5840’ Raise EDC

Tierra Group prepared an engineering design change to increase the maximum elevation permitted for the mine’s existing WWR. Project included a waste rock dump expansion civil design and stability modeling to verify design complied with regulatory dam safety criteria.

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT