Statement of Qualifications

Mankind lives on the earth. Everything built, either originated from, is built on, or interacts with, the earth. Geology is the science of the earth. Geotechnical Engineering is the application of geology and mathematics to use Earth’s natural resources to build infrastructure. Tierra Group International, Ltd. applies its geotechnical expertise to the conception, design, construction, and operations of physical structures for the mining industry, including:

  • Foundations
  • Tailings Dams
  • Water Dams
  • Heap Leach Pads
  • Mine Pits
  • Waste Rock Dumps
  • Hydraulic Structures (Canals, Channels, Pipelines, etc.)
  • Civil Infrastructure (Plants, Buildings, Roads, Bridges, etc.)

Tierra Group has applied its 100+ years combined professional geological and engineering expertise consulting on, or designing and constructing, dozens of these structures on six continents. This geographic variety has allowed Tierra Group’s Team to develop expertise designing facilities under challenging geotechnical conditions such as:

  • Laterites
  • Saprolites
  • Swelling or Collapsible Soils
  • Karst
  • Variable Geology
  • Highly and Active Seismicity (Earthquakes)
  • High Altitudes (4,000-m amsl)
  • Tropics

Tierra Group has innovatively adapted to these challenging environments using highly-trained professionals and state-of-the-art techniques and software to perform the following tasks and analyses:

  • Site Characterization
  • Soil/Rock Mechanics
  • Geologic Hazards - Landslide, Rock Fall, Avalanches, Seismic (Earthquakes)
  • Geotechnical Analyses - Slope, Stability, Seepage, Settlement, Consolidation, Deformation, Liquefaction
  • Civil Design and Specifications
  • Construction Documents
  • Resident Engineering
  • Quality Assurance
  • Operations Support
  • Forensics and Mitigation
  • Peer Reviews

Regardless of the geotechnical challenges posed, Tierra Group’s broad experience, intimate attention to site-specific conditions, and keen focus on developing innovative solutions, has earned us a respected reputation and loyal clients around the world.


Select Geotechnical Projects

Buriticá Tailings Stewardship & Cyanide Speciation

Tierra Group provided Tailings Stewardship Services for Continental Gold’s Buriticá Project in Antioquia, Columbia which included permitting support, Third-Party Review and construction and operations support. Tierra Group oversaw the development of a 2D hydrodynamic model to support the design of…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

El Gallo Mine

El Gallo is a 3,000 tpd open-pit gold/silver mine located in the foothills of the Sierra Madre Mountain Range in Mexico’s Sinaloa State. Gold is recovered through heap leaching and adsorption/desorption/recovery (ADR). Production commenced at El Gallo with the first gold pour in September…

VIEW PROJECT

Brushy Creek 2

Tierra Group was commissioned by Doe Run to design a new tailings storage facility at the Brushy Creek Mine. Tierra Group completed a geotechnical investigation including boring, classifying, and sampling soil and rock. Trade-off studies were performed to minimize construction…

VIEW PROJECT

Palmarejo Mine

Tierra Group performed an initial site visit to Coeur Mining’s Palmarejo Mine to conduct dam safety inspections of the tailings storage facility, environmental control dam, water diversion dam, and water diversion channel. Prior to the site visit, Tierra Group reviewed…

VIEW PROJECT

Ernesto e Pau-a-Pique

The Ernesto e Pau-a-Pique (EPP) Mine is located in the Municipality of Pontes e Lacerda, at 440 kms west of Cuiba City, Brazil. The mine is operated by Apoena Mining, a subsidiary of Aura Minerals Inc. Tierra Group was retained…

VIEW PROJECT

Fekola Project | Mali

Earthworks & Construction Quality Control (CQC) Services Tierra Group provided earthworks and concrete Construction Quality Control (CQC) services for B2Gold's Fekola Mine in western Mali. Tierra Group overcame the remote location and kept a dedicated team on-site throughout the 2-year…

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

Hollister Waste Rock Facility

Hollister Waste Rock Facility Storage Tierra Group performed a third-party peer review of a Waste Rock Storage Facility (WRSF) design at Klondex Mines’ (Klondex) Hollister Mine in northern Nevada. The WRSF, as designed, involved lining the mine’s existing West Pit…

VIEW PROJECT

Goldstrike Mine

Engineer of Record Barrick’s Goldstrike Mine processes 30,000 tons of gold ore per day from its combined open-pit/underground operations located in the historic Carlin Trend in Nevada, U.S.A. Goldstrike’s tailings are stored in the North Block Tailings Disposal Facility (NBTDF).…

VIEW PROJECT

San Francisco Mine

Tierra Group conducted geo-electrical testing to locate leaks present in the geomembrane liners underlying a Solution Conveyance Canal, Sumps 1 and 2, and the Intermediate Pond at Timmins Gold Corp’s San Francisco Mine in Sonora, Mexico. Leak detection testing procedures…

VIEW PROJECT

Isabella Pearl

Tierra Group performed a technical peer review of the Isabella Pearl heap leach facility (HLF) owned by Gold Resource Corporation. Isabella Pearl mine is located at the west end of the Santa Fe mining district in the Walker Lane gold…

VIEW PROJECT