Fire Creek Mine

Project Highlights:

  • Civil Design
  • Landfill Design
  • Hydrological/Hydraulics Analysis
  • Geotechnical Stability Analysis
  • Feasibility Study
  • Engineering Design Changes
  • Water Management
  • Waste Rock Storage Facility
  • Seepage Model
  • Closure Plan
  • Hydraulic Design
  • Slope Stability

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As part of the Preliminary Feasibility Study Tierra Group conducted a siting analysis for a new waste rock storage facility which is planned to support the mine’s future production increase. Tierra Group then prepared the design of the waste rock storage facility which was included in the Preliminary Feasibility Study submittal. In addition to supporting the Preliminary Feasibility Study Tierra Group has been able to aid Klondex by preparing and submitting several Engineering Design Changes to increase the operating life of the mine’s existing waste rock storage facility.

Final Plan for Permanent Closure

Tierra Group evaluated and prepared the Fire Creek site-wide Final Plan for Permanent Closure (FPPC)closure design to meet Nevada Division of Environmental Protection (NDEP) requirements. Design components included civil grading of the waste rock closure surface, stability analysis of closure slopes, and hydraulic design of channels and spillways. Tierra Group prepared a final design report for submission to regulatory agencies for approval. Closure activities and design were completed in a phased approach.

Project Highlights:

  • Civil Design
  • Landfill Design
  • Hydrological/Hydraulics Analysis
  • Geotechnical Stability Analysis
  • Feasibility Study
  • Engineering Design Changes
  • Water Management
  • Waste Rock Storage Facility
  • Seepage Model
  • Closure Plan
  • Hydraulic Design
  • Slope Stability

Similar projects

Cerro Negro

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Newcrest Cadia Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Isabella Pearl

Tierra Group performed a technical peer review of the Isabella Pearl heap leach facility (HLF) owned by Gold Resource Corporation. Isabella Pearl mine is located at the west end of the Santa Fe mining district in the Walker Lane gold…

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT

Karouni Mine

Tierra Group reviewed and provided pit slope recommendations and conducted hydrological assessments for the Resource 1 and 2 deposits water management system at Troy Resources’ Karouni Mine (Karouni). Advanced pre-feasibility level recommendations for pit development were provided based on benchmarking…

VIEW PROJECT

Pinos Altos Mine

Tierra Group provided slope stability analysis for Agnico Eagle’s dry stack tailings storage facility containing 330,000 tonnes of tailings.

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

Buriticá Tailings Stewardship & Cyanide Speciation

Tierra Group provided Tailings Stewardship Services for Continental Gold’s Buriticá Project in Antioquia, Columbia which included permitting support, Third-Party Review and construction and operations support. Tierra Group oversaw the development of a 2D hydrodynamic model to support the design of…

VIEW PROJECT

Black Butte Copper Project

Tierra Group performed an independent engineering design review of a Cemented Tailings Facility (CTF) and multiple processes and freshwater ponds. Tailings will be mixed with cement at the paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.

VIEW PROJECT

Los Gatos Project

TSF Design and CQA Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico. Tierra Group then…

VIEW PROJECT