Mexican Hat PEA Update

Project Highlights:

  • Preliminary Economic Assessment
  • Heap Leach

Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.

Project Highlights:

  • Preliminary Economic Assessment
  • Heap Leach

Similar projects

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT

Bunker Hill | Tailings Storage Facility (TSF) Design

Tierra Group designed the Bunker Hill dry stack TSF. The TSF design was challenging given the limited land area, steep terrain, seasonal cold weather, and surface water management. Tierra Group’s scope of work included siting the facilities, geotechnical investigations, civil…

VIEW PROJECT

Amulsar Gold Project

Tierra Group completed a technical review of the heap leach pad for the Amulsar Mine property owned by Lydian Armenia located near the town of Jermuk to the southeast of Armenia. The heap leach pad consists of four phases with…

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT

Douglas County, CO | 2020 Stormwater Support

Tierra Group provided engineering and permitting support to Douglas County Public Works Engineering for NPDES Phase II Program compliance. Tierra Group’s scope of work included developing Runoff Control Plans (RCPs) for new County facilities, updating RCPs at existing County facilities,…

VIEW PROJECT

Çöpler Tailings Storage Facility and Heap Leach Facility Technical Review

Tierra Group has a history of annually providing third-party technical reviews for the tailings storage facility and heap leach facility at Anagold's Çöpler Gold Mine in Middle Anatolia, Turkey. Additionally, Tierra Group currently performs independent technical reviews for the rockfill…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…

VIEW PROJECT

Black Butte Copper Project

Tierra Group performed an independent engineering design review of a Cemented Tailings Facility (CTF) and multiple processes and freshwater ponds. Tailings will be mixed with cement at the paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT

San Albino Dry Stack Tailings Storage Facility Design

Tierra Group supported construction of the San Albino Mine in Nueva Segovia, Nicaragua. Tierra Group designed a dry stack drum filtered-tailings storage facility. A siting study optimized the dry stack location and minimized CAPEX and OPEX. Tierra Group developed a site-wide water…

VIEW PROJECT

Stibnite Gold Project

The Stibnite project is located in the remote central Idaho Rockies near the town of Yellow Pine.  It is a brownfields gold-antimony project featuring three open pits and an anticipated 22,000 tpd plant throughput, along with challenging terrain and environmental…

VIEW PROJECT

Newcrest Cadia Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Rhyolite Ridge

Tierra Group is providing water management and geotechnical engineering services to support a Preliminary Feasibility Study at the Rhyolite Ridge Lithium Mine Project in Nevada.