Tierra Group performed a study of Masbate’s 12-Mt tailings storage facility. Services provided included a forensic study to determine the cause of seepage through an abutment and performed an independent safety audit of tailings management practices. A risk analysis was performed and water management optimization recommendations were made. Tierra Group and its sub-consultants then designed and commissioned a 15,000-m3/d supernatant water treatment plant. The water treatment plant was commissioned in early 2015 and has run continuously at 90 to 95% efficiency, greatly improving the mine’s site-wide water balance.

Project Highlights:

  • Forensics Analysis
  • Due Diligence
  • Mine Plan Optimization
  • Water Management
  • Water Treatment

Similar projects

El Diamante Hydropower Dam

Tierra Group conducted a Preliminary Site Assessment of a potential large-scale landslide near the El Diamante Hydropower Complex in Matagalpa, Nicaragua.

VIEW PROJECT

Yauricocha Mine

The Yauricocha Mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

Goldstrike Mine

Engineer of Record Barrick’s Goldstrike Mine processes 30,000 tons of gold ore per day from its combined open-pit/underground operations located in the historic Carlin Trend in Nevada, U.S.A. Goldstrike’s tailings are stored in the North Block Tailings Disposal Facility (NBTDF).…

VIEW PROJECT

Rhyolite Ridge

Tierra Group is providing water management and geotechnical engineering services to support a Preliminary Feasibility Study at the Rhyolite Ridge Lithium Mine Project in Nevada.

VIEW PROJECT

Esmeralda Mill

Tierra Group was contracted by Waterton Global Mining Company to prepare the FPCP for TSF No.1 at the Esmeralda Mine. TSF No.1 covered approximately 100 acres, included a rockfill embankment with a maximum height approximately 60 feet, and stored gold tailings. Work…

VIEW PROJECT

Newcrest Red Chris Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Anglo American Quellaveco Mine | PerĂº

Tierra Group supervised a geotechnical and hydrogeologic drilling investigation program at Anglo American’s Quellaveco Mine in the Moquegua Region of Peru. Geotechnical Investigation Tierra Group developed a geotechnical and hydrogeological research plan within and near the Quellaveco Pit footprint. This…

VIEW PROJECT

Sterling Mine

Sterling Mine is an underground gold mine in southern Nevada which recovers gold through heap leaching and a carbon adsorption-desorption-recovery (ADR) plant. Tierra Group team members have a long history at Sterling, starting with heap leach pad final permanent closure…

VIEW PROJECT

Dam Low Level Outlet Replacement

Tierra Group completed a geotechnical investigation, which included overseeing hollow stem auger (HSA) drilling and laboratory testing, that characterized the existing earthen dam. Tierra Group completed a low-level outlet structure design that was believed to have been compromised by internal…

VIEW PROJECT

El Cubo

Tierra Group provided Tailings Stewardship Services including a dam inspection, slope stability analysis review and operational improvements for Endeavour Silver’s El Cubo tailings storage facility in Guanajuato, Mexico.

VIEW PROJECT

El Aguila

Tierra Group performed a 3rd party engineering design peer review of a tailings storage facility expansion design. The review resulted in the owner realizing $650,000 in cost savings without compromising the facility's design integrity over the original design. Tierra Group also…

VIEW PROJECT

Pitarrilla Mine

Tierra Group participated as a member of a multi-disciplinary project team to develop a Definitive Feasibility study for a 16,000 tpd silver mine in Durango, Mexico. Tierra Group's responsibilities included designing a 112 Mt tailings storage facility, developing a site-wide…

VIEW PROJECT