El Mochito Mine

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided engineering consultancy, design, and construction services for three tailings storage facilities (El Bosque, Pozo Azul, and Soledad) to maintain continuous mining operations. Being located in the tropics, tailings management at El Mochito has been fraught with many challenges including; monsoons, floods, karstik terrain, debris flows, constructing with tropical soils (laterite and saprolite), and social unrest. During the full mine life-cycle of three tailings storage facilities, Tierra Group has persevered with the owners and mine management to maintain continual operations with zero lost-time accidents.

Since 2012, Tierra Group has provided EoR support for the Bosque, Pozo Azul, and Soledad TSFs. Tierra Group engineers provided engineering consultancy, design, and construction services to maintain continuous mining operations for three cyclone sand tailings dams (El Bosque, Pozo Azul, and Soledad). Additional EoR support included performance monitoring data acquisition and review, site-specific dam safety inspections, operations, and performance monitoring assessments.

Tailings management at El Mochito has been fraught with challenges: monsoons, floods, karstic terrain, debris flows, construction in tropical soils (laterite and saprolite), and social unrest. Nevertheless, during the entire mine life-cycle of three TSFs, Tierra Group has persevered with the owners and mine management to maintain operations with zero lost-time accidents.

In 2021,Tierra Group provided engineering services for the Soledad TSF Stage 5 raise, including impoundment grading, conventional impoundment lining (with geomembrane), and steep slope impoundment linings (with geomembrane and additional geosynthetic reinforcement).

Tierra Group remains the Engineer of Record for El Mochito, with 2022 and 2023 accomplishments encompassing the Soledad TSF dam raise, involving stability analysis and civil design for an upstream raise to reach an 810-meter crest elevation. Furthermore, Tierra Group sustained its support for monitoring the closure of El Bosque and Pozo Azul TSFs.

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

Similar projects

Andina Veladero Engineering Review

Tierra Group performed a forensic study to determine the cause for volumetrically non-compliant leakage volumes occurring in the heap leach facilities leak detection system. Tierra Group reviewed the facility design, engineering and construction quality assurance (CQA) information, construction as built…

VIEW PROJECT

Los Filos Mine

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Lost Creek Project | USA

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT

El Aguila

Tierra Group performed a 3rd party engineering design peer review of a tailings storage facility expansion design. The review resulted in the owner realizing $650,000 in cost savings without compromising the facility's design integrity over the original design. Tierra Group also…

VIEW PROJECT

Fire Creek Mine

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As…

VIEW PROJECT

Orotex Mine Project

Tierra Group provided tailings engineering design and consulting services for the redevelopment of the Orotex underground mine in Alajuela, Costa Rica. Tierra Group's areas of responsibility included tailings and water management in this environmentally sensitive, high rainfall, tropical, mountainous region.

VIEW PROJECT

Myra Falls

Tierra Group provides Tailings Stewardship Services for Nyrstar's Myra Falls Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, site training and in depth inspections of management practices and facilities…

VIEW PROJECT

Cerro Negro

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Bunker Hill

Dry Stack Tailings Storage Facility Tierra Group designed a dry stack TSF to store excess tailings from the underground paste backfill. The dry stack TSF was challenging, given the limited land area, steep terrain, seasonal cold weather, and surface water…

VIEW PROJECT

Tennessee Mines

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to…

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.

VIEW PROJECT

Stibnite Gold Project

The Stibnite project is located in the remote central Idaho Rockies near the town of Yellow Pine.  It is a brownfields gold-antimony project featuring three open pits and an anticipated 22,000 tpd plant throughput, along with challenging terrain and environmental…

VIEW PROJECT