Tierra Group diseñó el TSF de pila seca de Bunker Hill. El diseño del TSF fue un desafío debido a la superficie terrestre limitada, el terreno empinado, el clima frío estacional y la gestión del agua superficial. El alcance del trabajo de Tierra Group incluyó la ubicación de las instalaciones, investigaciones geotécnicas, diseño civil, controles de aguas superficiales, diseño de contención y análisis geotécnicos.

Project Highlights:

  • Diseño civil
  • Relaves secos
  • Investigación geotécnica
  • Administracion del Agua
  • Diseño de contención

Similar projects

Aurora Mine

The Aurora Mine Mill Facility (previously Esmeralda Mill) is located in the historic Aurora mining district of the eastern Sierra Nevada Mountain Range in Nevada, USA. Aurora recently, with the support of Tierra Group completed a Minor Modification to the…

VIEW PROJECT

Tonopah Flats | Tailings Storage Facility

Tierra Group assisted with developing tailings disposal alternatives.

VIEW PROJECT

Tailings Review & Assurance Audit | Montana

Tailings Management Assurance Review Tierra Group served as the Lead Auditor and conducted MARs for the TSFs at this confidential project. Tierra Group reviewed all available facility documentation, including OMS Manuals, EAPs, design reports, As-Built Reports, annual inspection reports, and other…

VIEW PROJECT

Stillwater Mine

East Boulder Tailings Independent Review Panel (2018-present) Tierra Group reviewed a TSF design to support an NI 43-101 compliant Feasibility Study. The TSF design incorporated a paste tailings disposal method in an environmentally sensitive fisheries habitat. Tierra Group sits on the Independent…

VIEW PROJECT

Douglas County Public Works

Tierra Group updated the County’s Standard Operating Procedures (SOPs) for Municipal Operations to maintain the County’s compliance with the requirements for stormwater discharges from the County’s municipal separate storm sewer system (MS4) under the Colorado Discharge Permit System (CDPS). Tierra…

VIEW PROJECT

Mexican Hat PEA Update

Tierra Group conducted an update of the Mexican Hat Project’s Preliminary Economic Assessment. Tierra Group’s update included the heap leach facility design and preliminary stacking plan, waste rock storage pad, and crushed rock storage pad design.

VIEW PROJECT

Big Ledge Mine

Tierra Group developed a water balance model to track flows into a backfilled pit at the closed Big Ledge Mine Barite Operation near Wells, Nevada. The Model was used to determine pipeline sizing to a remote treatment pond that is…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

New Jersey Mill TSF

Tierra Group completed a siting study to evaluate six potential sites for a paste TSF. Tierra Group prepared civil layouts for each TSF, determining embankment fill volumes, evaluating required diversions for upstream catchment areas, and pipeline corridor layouts. Tierra Group…

VIEW PROJECT

Ray Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

Sterling Mine

Sterling Mine is an underground gold mine in southern Nevada which recovers gold through heap leaching and a carbon adsorption-desorption-recovery (ADR) plant. Tierra Group team members have a long history at Sterling, starting with heap leach pad final permanent closure…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…