American Gypsum

Project Highlights:

  • Civil Design
  • Infrastructure Support
  • Safety Improvement
  • Long-Term Planning
  • Permitting
  • Mine Plan of Operations
  • Water Resources
  • Hydrology

American Gypsum Pit Planning and Support

Tierra Group began working at American Gypsum’s Eagle-Gypsum mine located in Gypsum, Colorado in 2014 evaluating haul road improvements. A trade-off study provided a tool for American Gypsum to evaluate safety improvements including alternative haul road alignments and grades, runaway truck ramps, and similar means to reduce risk to haul truck operators. Tierra Group completed long-term pit planning to evaluate current remaining reserves and future potential expansion, which included pit layouts and optimization, waste dump planning, access road/haul route layouts, sediment controls, and surface water management alternatives. Tierra Group has developed preliminary alternatives analyses through scoping-level designs.

Additionally, Tierra Group, teamed with SWCA, completed the engineering design, and prepared a Mine Plan of Operations (MPO) Modification. The MPO modification was prepared to provide an additional 30+ years of mine life. Engineering design included roadway design, open pit planning for a new open pit, hydrologic modeling and hydraulic design, erosion and sediment control evaluations, and stormwater pond design. SWCA completed additional surveys in support of MPO development and acted as the lead for consultation with the Bureau of Land Management.

Sediment Pond Re-Evaluation

Tierra Group updated the existing HEC-HMS models to confirm the spillways can adequately pass flow from the 100-year, 24-hour storm event and to verify that the maximum water surface will be contained within the East and Upper Pits.

Project Highlights:

  • Civil Design
  • Infrastructure Support
  • Safety Improvement
  • Long-Term Planning
  • Permitting
  • Mine Plan of Operations
  • Water Resources
  • Hydrology

Similar projects

2020 TSF Annual Dam Inspection

Tierra Group completed an annual dam safety inspection (DSI) to meet both Nevada Division of Water Resources (NDWR) Dam Safety and the client's requirements. The DSI included reviewing monitoring data, a dam and appurtenant structures inspection, and a DSI report.

VIEW PROJECT

Topia Mine

Topia Mine Phases 1-3Tierra Group supervised the first 3 phases of Geologic Mapping and Instrumentation Installation and developed a Mechanically Stabilized Earth Wall Design at Great Panther Silver’s Topia Mine in Durango, Mexico.

VIEW PROJECT

Hollister Waste Rock Facility

Hollister Waste Rock Facility Storage Tierra Group performed a third-party peer review of a Waste Rock Storage Facility (WRSF) design at Klondex Mines’ (Klondex) Hollister Mine in northern Nevada. The WRSF, as designed, involved lining the mine’s existing West Pit…

VIEW PROJECT

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT

Tennessee Mines

Tierra Group performed Dam Safety Reviews (DSRs) for Nyrstar’s tailings storage facilities (TSFs) located in Tennessee, United States.  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard, and to…

VIEW PROJECT

Dam Low Level Outlet Replacement

Tierra Group completed a geotechnical investigation, which included overseeing hollow stem auger (HSA) drilling and laboratory testing, that characterized the existing earthen dam. Tierra Group completed a low-level outlet structure design that was believed to have been compromised by internal…

VIEW PROJECT

Lost Creek Project | USA

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT

Mission Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

Karouni Mine

Tierra Group reviewed and provided pit slope recommendations and conducted hydrological assessments for the Resource 1 and 2 deposits water management system at Troy Resources’ Karouni Mine (Karouni). Advanced pre-feasibility level recommendations for pit development were provided based on benchmarking…

VIEW PROJECT

Oracle Ridge Copper

Tierra Group represented Oracle Ridge Mining as the Qualified Person for portions of the feasibility-level design including the Dry Stack Tailings Storage Facility (TSF) Design, Site-Wide Stormwater Management, Water Supply Pipelines, Haul Road and Access Road Design Improvements, and the…

VIEW PROJECT

Yauricocha Mine

The Yauricocha Mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

El Diamante Hydropower Dam

Tierra Group conducted a Preliminary Site Assessment of a potential large-scale landslide near the El Diamante Hydropower Complex in Matagalpa, Nicaragua.

VIEW PROJECT