Midas Mine

Project Highlights:

  • Tailings Management Plan
  • Facility Water Balance
  • Tailings Facility Siting Analysis

The Midas Mine is located in northern Nevada, and is owned and operated by Klondex Mines LTD.  The mine is an underground mine with an operating mill. The mine’s existing tailings facilities are nearing their end of operating life and the mine was investigating ways to maximize storage within each facility. Tierra Group assisted Klondex by preparing several evaluations to aid in the mine’s tailings storage operations. Tierra Group’s evaluation included preparation of a tailings management plan and a facility water balance. These evaluations provided the mine with information to manage their tailings deposition and supernatant water pools while also maximizing the facility’s storage capacity. Additionally, Tierra Group prepared a siting study to determine the preferred location of a future tailings storage facility. The siting study included preparing the feasibility level facility design at multiple sites and preparing a design report with Tierra Group’s recommendations.

Project Highlights:

  • Tailings Management Plan
  • Facility Water Balance
  • Tailings Facility Siting Analysis

Similar projects

Confidential Project - Nevada

Tierra Group provided the closure civil engineering design and associated surface water management for a project in Nevada. Tierra Group also provided permitting requirements to Nevada Department of Environmental Protection.

VIEW PROJECT

Lost Creek Project

Tierra Group is assisting Millcreek Mining and Black Mountain Sand with the preparation of permitting documents for the Lost Creek Project; including a preliminary Stormwater Management Plan, preliminary Groundwater Monitoring Plan, and general permitting exhibits. Tierra Group conducted a site geotechnical…

VIEW PROJECT

Bald Mountain Mine

Tierra Group assisted the Bald Mountain Mine Project Development Team with an evaluation of potential uses for spent ore on legacy heap leach facilities. Tierra Group completed a collaborative trade-off study with site personnel evaluating spent ore use as overliner…

VIEW PROJECT

Yauricocha Mine

The Yauricocha Mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

Los Gatos TSF Management

Tierra Group provided Engineer of Record services; including the development of Operations, Maintenance, and Surveillance (OMS) Manual, the development of an Emergency Action Plan (EAP), and annual operational support to the Los Gatos project in Mexico.

VIEW PROJECT

Los Pelambres Tailings Stewardship

Tierra Group implemented a Corporate Tailings Stewardship Program at Antofagasta Minerals’ Los Pelambres Copper Mine in the Coquimbo Region of Chile. The program included data acquisition, a dam safety inspection, site-specific operations training, and improvement recommendations in tailings management practices.

VIEW PROJECT

Project Track Technical Review

Tierra Group conducted a pre-investment due diligence Technical Review including; Environmental, Permitting, and Social License; Geology and Mineral Resources; Mining and Reserves; Metallurgy and Process Design; Geotechnical, Hydrology, and Hydrogeology; Project Infrastructure, Heap Leach Facility, and Waste Disposal; and Capital…

VIEW PROJECT

Quinsam Coal

Tierra Group served as an independent subject matter expert for the Quinsam Coal Corporation (QCC) Independent Tailings Review Board (ITRB) in British Columbia, Canada. The annual review process included review of existing documents, a site visit, and collaborative meetings with…

VIEW PROJECT

Confidential Project - Wisconsin

Tierra Group conducted a Due Diligence Review for a project in Wisconsin, US.

VIEW PROJECT

Morro do Ipe Due Diligence

Tierra Group served on an Independent Engineering Team performing a tailings management and operations Due Diligence Technical Review at the Morro do Ipe iron ore mine in Minas Gerais, Brazil.

VIEW PROJECT

Freeboard Reduction

Tierra Group performed calculations and developed a technical memorandum requesting temporary authorization to impund within the current stage freeboard limits.

VIEW PROJECT

Hecla Aurora Project - Weather Station Siting Assessment

Tierra Group completed a site assessment for a weather station to be installed at the site. The assessment evaluated the foundation conditions and provided recommendations regarding anchoring options for the weather station tower and ancillary components. The assessment also identified…

VIEW PROJECT