El Mochito Mine

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided engineering consultancy, design, and construction services for three tailings storage facilities (El Bosque, Pozo Azul, and Soledad) to maintain continuous mining operations. Being located in the tropics, tailings management at El Mochito has been fraught with many challenges including; monsoons, floods, karstik terrain, debris flows, constructing with tropical soils (laterite and saprolite), and social unrest. During the full mine life-cycle of three tailings storage facilities, Tierra Group has persevered with the owners and mine management to maintain continual operations with zero lost-time accidents.

Since 2012, Tierra Group has provided EoR support for the Bosque, Pozo Azul, and Soledad TSFs. Tierra Group engineers provided engineering consultancy, design, and construction services to maintain continuous mining operations for three cyclone sand tailings dams (El Bosque, Pozo Azul, and Soledad). Additional EoR support included performance monitoring data acquisition and review, site-specific dam safety inspections, operations, and performance monitoring assessments.

Tailings management at El Mochito has been fraught with challenges: monsoons, floods, karstic terrain, debris flows, construction in tropical soils (laterite and saprolite), and social unrest. Nevertheless, during the entire mine life-cycle of three TSFs, Tierra Group has persevered with the owners and mine management to maintain operations with zero lost-time accidents.

In 2021,Tierra Group provided engineering services for the Soledad TSF Stage 5 raise, including impoundment grading, conventional impoundment lining (with geomembrane), and steep slope impoundment linings (with geomembrane and additional geosynthetic reinforcement).

Tierra Group remains the Engineer of Record for El Mochito, with 2022 and 2023 accomplishments encompassing the Soledad TSF dam raise, involving stability analysis and civil design for an upstream raise to reach an 810-meter crest elevation. Furthermore, Tierra Group sustained its support for monitoring the closure of El Bosque and Pozo Azul TSFs.

Project Highlights:

  • Upstream Cyclone Tailings Dam Design
  • Downstream Earthfill Tailings Dam Designs
  • Geologic Hazards Assessment
  • Detailed Design for Construction
  • As-Built Drawings
  • Emergency Action Plans
  • Operations Plans
  • Risk Analyses
  • CQA
  • Sighting and Alternatives Analyses
  • Hydraulics
  • Liqefaction
  • Water Balance

Similar projects

Aurora Mine

The Aurora Mine Mill Facility (previously Esmeralda Mill) is located in the historic Aurora mining district of the eastern Sierra Nevada Mountain Range in Nevada, USA. Aurora recently, with the support of Tierra Group completed a Minor Modification to the…

VIEW PROJECT

Peñasquito

Tierra Group was selected to assist Goldcorp with global Tailings Stewardship Strategy (TSS) implementation at all of Goldcorp’s active tailings sites in Latin America (Mexico, Argentina, and Guatemala). Tierra Group worked in conjunction with Goldcorp and another global engineering consulting…

VIEW PROJECT

Bolivar Mine

The Bolivar mine is a 3,000 tonne per day underground mining operation in Chihuahua, Mexico producing copper, zinc, silver, and gold. Space constraints in mountainous terrain require dewatering tailings to reduce required area for tailings storage. Tierra Group is assisting…

VIEW PROJECT

Stillwater Mine

Nye-Hertzler Tailings Independent Review Panel (2020-2023) Tierra Group reviewed the TSF design to support an NI 43-101 compliant Feasibility Study. The TSF design incorporated a paste tailings disposal method in an environmentally sensitive fisheries habitat. Tierra Group sits on the Independent Review…

VIEW PROJECT

Tailings Review & Assurance Audit | Montana

Tailings Management Assurance Review Tierra Group served as the Lead Auditor and conducted MARs for the TSFs at this confidential project. Tierra Group reviewed all available facility documentation, including OMS Manuals, EAPs, design reports, As-Built Reports, annual inspection reports, and other…

VIEW PROJECT

Dona Lake DSR

Serving on Newmont Goldcorp’s Tailings Independent Review Board, Tierra Group provided an Independent Dam Safety Review for the Dona Lake Mine tailings storage facility in Pickle Lake, Ontario, Canada.

VIEW PROJECT

Goldfield Bonanza Project

Lode-Star Gold, Inc., in advance of their proposed mining operations, submited a Physical Separation Facility application with the State of Nevada for their Goldfield Bonanza Project located in Esmeralda County, Nevada. The mine, located in the historic high-grade gold-bearing district of…

VIEW PROJECT

Ray Mine

Tierra Group is implementing a corporate Tailings Stewardship Strategy (TSS) at all of ASARCO Grupo Mexico’s mines in Arizona, USA (Hayden, Mission and Ray mines). Tierra Group conducted a site visit to each site to perform dam safety inspections, interview…

VIEW PROJECT

Gediktepe Peer Review

Tierra Group provided technical direction and review of the Gediktepe Heap Leach Facility (HLF), ponds, and waste rock dump facility designs. Tierra Group will also provide CQA review during HLF construction.

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

La Trinidad

Tierra Group began work at La Trinidad providing heap leach pad construction recommendations and a water balance. Tierra Group continued support with a heap leach pad expansion design, slope stability analyses, hydrologic analyses, diversion design, liner design, and leach solution…

VIEW PROJECT

Campo Morado Mine

Tierra Group performed a Dam Safety Review (DSR) for Nyrstar’s tailings storage facility (TSF) located in Campo Morado (Guerrero, Mexico).  Tierra Group served as the Tailings Reviewer to ensure conformity with local regulations, the Nyrstar Tailings Storage Facility (TSF) Standard,…

VIEW PROJECT