Fire Creek Mine

Project Highlights:

  • Civil Design
  • Landfill Design
  • Hydrological/Hydraulics Analysis
  • Geotechnical Stability Analysis
  • Feasibility Study
  • Engineering Design Changes
  • Water Management
  • Waste Rock Storage Facility
  • Seepage Model
  • Closure Plan
  • Hydraulic Design
  • Slope Stability

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As part of the Preliminary Feasibility Study Tierra Group conducted a siting analysis for a new waste rock storage facility which is planned to support the mine’s future production increase. Tierra Group then prepared the design of the waste rock storage facility which was included in the Preliminary Feasibility Study submittal. In addition to supporting the Preliminary Feasibility Study Tierra Group has been able to aid Klondex by preparing and submitting several Engineering Design Changes to increase the operating life of the mine’s existing waste rock storage facility.

Final Plan for Permanent Closure

Tierra Group evaluated and prepared the Fire Creek site-wide Final Plan for Permanent Closure (FPPC)closure design to meet Nevada Division of Environmental Protection (NDEP) requirements. Design components included civil grading of the waste rock closure surface, stability analysis of closure slopes, and hydraulic design of channels and spillways. Tierra Group prepared a final design report for submission to regulatory agencies for approval. Closure activities and design were completed in a phased approach.

Project Highlights:

  • Civil Design
  • Landfill Design
  • Hydrological/Hydraulics Analysis
  • Geotechnical Stability Analysis
  • Feasibility Study
  • Engineering Design Changes
  • Water Management
  • Waste Rock Storage Facility
  • Seepage Model
  • Closure Plan
  • Hydraulic Design
  • Slope Stability

Similar projects

El Aguila

Tierra Group performed a 3rd party engineering design peer review of a tailings storage facility expansion design. The review resulted in the owner realizing $650,000 in cost savings without compromising the facility's design integrity over the original design. Tierra Group also…

VIEW PROJECT

Guanacevi

Tierra Group provided Tailings Stewardship Services, including a dam inspection, slope stability review and operational improvements. The Guanacevi tailings storage facility, located in Durango, Mexico, consists of dry-stack (Press filtered) tailings placed atop a conventional (slurry) tailings storage facility.

VIEW PROJECT

Equity Silver ITRB

Tierra Group's Matt Fuller, LEG, P.Geo. serves as one of three ITRB technical experts providing technical assurance of the Engineer of Record’s design and monitoring compliance with BC regulations, the Newmont Corporate Tailings Standard, and industry best practices.

VIEW PROJECT

Isabella Pearl

Tierra Group performed a technical peer review of the Isabella Pearl heap leach facility (HLF) owned by Gold Resource Corporation. Isabella Pearl mine is located at the west end of the Santa Fe mining district in the Walker Lane gold…

VIEW PROJECT

La Libertad Mine

Tierra Group engineers designed La Esperanza TSF, a 2.1-km long, 35-m high, earthfill tailings dam with an HDPE lined impoundment footprint of 840,000 m2. Tierra Group  designed and provided Construction Quality Assurance (CQA) for all subsequent downstream dam stages. Stage…

VIEW PROJECT

New Jersey Mill TSF Scoping Study

Tierra Group completed the design for two 3-meter upstream raises to an existing paste tailings storage facility at New Jersey Mining Company’s New Jersey Mill site near Kellogg, Idaho. Work included performing a cone penetration testing (CPT) investigation of the…

VIEW PROJECT

Esmeralda Mill

Tierra Group was contracted by Waterton Global Mining Company to prepare the FPCP for TSF No.1 at the Esmeralda Mine. TSF No.1 covered approximately 100 acres, included a rockfill embankment with a maximum height approximately 60 feet, and stored gold tailings. Work…

VIEW PROJECT

Fire Creek Mine

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As…

VIEW PROJECT

Mascota Mine

Creston Mascota Mine is located in Chihuahua, Mexico and is owned and operated by Agnico Eagle Mexico. Tierra Group designed the Phase 4 heap leach pad, buttress, which included geotechnical investigations, slope stability analyses and a water balance for Agnico…

VIEW PROJECT

Sepon Mine CQA

Tierra Group performed Resident Engineering and Construction Quality Control/Assurance during a pilot Heap Leach Facility construction, and Life of Mine Heap Leach and Tailings Sorage Facility siting, design, and tailings management at Lane Xang Minerals' Sepon Mine in Laos.

VIEW PROJECT

Black Butte Copper Project

Tierra Group performed an independent engineering design review of a Cemented Tailings Facility (CTF) and multiple processes and freshwater ponds. Tailings will be mixed with cement at the paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT

Empire State Mine

Dam Breach Analyses Tierra Group prepared a DBA to evaluate potential downstream impacts due to a hypothetical failure (breach) in three components of Empire State Mines (ESM) tailings storage facility (TSF): North Dam (ND), South Dam (SD), and West Perimeter…

VIEW PROJECT